Geri Dön

Yap işlet devret modeliyle gerçekleştirilen ulaştırma projelerinde karşılaşılan risklerin belirlenmesi ve değerlendirilmesi: Türkiye örnekleri

Determination and evaluation of risks in build operate transfer transportation projects: Examples of Turkey

  1. Tez No: 719932
  2. Yazar: BUSE KURUL
  3. Danışmanlar: DR. ÖĞR. ÜYESİ NUR ATAKUL
  4. Tez Türü: Yüksek Lisans
  5. Konular: Ekonomi, Mühendislik Bilimleri, İnşaat Mühendisliği, Economics, Engineering Sciences, Civil Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2022
  8. Dil: Türkçe
  9. Üniversite: Mimar Sinan Güzel Sanatlar Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Yapı Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Yapım-Proje Yönetimi Bilim Dalı
  13. Sayfa Sayısı: 180

Özet

Küreselleşme ve dünya genelindeki nüfus artışıyla birlikte altyapı ihtiyaçları artmış ancak az gelişmiş ülkelerin kaynakları bu ihtiyacı karşılamakta yetersiz kalmıştır. Kamunun finansal yükünü azaltmak ve özel şirketlerin imkânlarından faydalanabilmek için 'Kamu-Özel İşbirliği' (KÖİ) modeli ortaya çıkmıştır. KÖİ modeli çeşitli projelerin yapımında kullanılmaktadır, fakat günümüzde ulaştırma projelerinin artmasından ötürü 'Yap İşlet Devret' (YİD) modeli yaygınlaşmıştır. YİD modeli bazı faydalar sağlarken, bazı risk faktörleri barındırmaktadır. Çünkü YİD projeleri yüksek sermaye gerektirir, yapım ve işletme süreleri uzundur ve yatırımın geri dönüşü uzun sürmektedir. Literatürde konuyla ilgili çokça araştırmaya rastlanmış, ancak Türkiye'de YİD modeliyle gerçekleştirilen ulaştırma projeleriyle ilgili yeterli araştırmaya rastlanmamıştır. Bu araştırmada; Türkiye'de YİD modeliyle gerçekleştirilen ulaştırma projelerinde karşılaşılan risk faktörlerinin araştırılması, Dünya'daki diğer örnekler ile karşılaştırılması ve belirlenen risk faktörlerine yönelik önerilerin getirilmesi amaçlanmıştır. Araştırmanın odak noktası Türkiye'deki güncel ulaştırma projesi örnekleridir. İncelenen vakalarda, Gebze-İzmir Otoyolu projesinde politik riskler, maliyet aşımı ve beklenen piyasa talebine ulaşılamaması faktörleri öne çıkmıştır. Kuzey Marmara Otoyolu ve Yavuz Sultan Selim Köprüsü projesinde projenin kapsamından ve yaşanan çevresel kaygılardan ötürü ihale süreciyle ilgili sorunlar yaşanması ve beklenen piyasa talebine ulaşılamaması faktörleri dikkat çekmiştir. İstanbul Havalimanı projesinde ise zemin ıslah işlerinden kaynaklandığı düşünülen maliyet aşımı, projenin çevresel kaygılar yaratması, kamusal ve siyasal muhalefet ve beklenen piyasa talebine ulaşılamaması faktörleri öne çıkmıştır. Araştırma bulguları her üç projede karşılaşılan temel risk faktörünün beklenen piyasa talebine ulaşılamaması olduğunu göstermiştir. Projelerde karşılaşılan diğer risk faktörlerinin çoğunun literatür ile uyumlu olduğu görülmüştür. Ancak İstanbul Havalimanı projesinde karşılaşılan bazı risk faktörleri literatürden farklılık göstermiştir. Bu araştırmanın bundan sonra yapılacak olan çalışmalara ışık tutacağı düşünülmüştür.

Özet (Çeviri)

In order to respond the increasing infrastructure problem around the world and reduce the financial burden of the government, 'Public-Private Partnership' (PPP) model has emerged. Due to the increase in transportation projects, the BOT model has become widespread. However BOT model requires high capital, it's construction and operation times are long and the return of the investment takes a long time. There has been a lot of research about the subject in the literature, but there has not been enough research about BOT transportation projects in Turkey. By this research, it is aimed to investigate the risk factors in BOT transportation projects in Turkey, compare them with other examples in the world and make recommendations. From the BOT transportation project examples in Turkey, in Gebze-Izmir Highway Project, most common risk factors were: political risks, cost overruns and failure to reach the expected market demand (FEMD); in Northern Marmara Highway and Yavuz Sultan Selim Bridge Project: problems in the tender process, the environmental concerns about the project and FEMD factors and in Istanbul Airport Project: cost overruns, environmental concerns, public and political opposition and FEMD. It is found that the main risk factor in projects was the inability to reach the expected market demand. Also, most of the risk factors in the projects are compatible with the literature. However, some risk factors in Istanbul Airport project differed from the literature. It is thought that this research will shed light on the studies that will be carried out after this.

Benzer Tezler

  1. Türkiye'de yap-işlet-devret (YİD) modeli ile yapılan ulaştırma yatırımlarının kamu harcamaları üzerindeki etkileri

    Impacts of the transport investments through thebuild-operate-transfer (BOT) model on public expenditures in Turkey

    ÖMER SEVGİLİ

    Yüksek Lisans

    Türkçe

    Türkçe

    2021

    MaliyeAnkara Hacı Bayram Veli Üniversitesi

    Maliye Ana Bilim Dalı

    PROF. DR. AHMET AK

  2. İnşaat sektöründe YİD (Yap-İşlet-Devret) modeli sözleşmeler ile yapım işleri sözleşmelerinin karşılaştırılması: DHMİ, DLH ve TCK uygulama örnek sözleşmeleri

    Comparison of the construction works contracts and BOT (Build-Operate-Transfer) contracts in construction sector: DHMI, DLH and TCK sample application contracts

    MUHAMMED KOÇER

    Yüksek Lisans

    Türkçe

    Türkçe

    2008

    İnşaat MühendisliğiEskişehir Osmangazi Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    YRD. DOÇ. DR. OSMAN AYTEKİN

  3. Türkiye'de hazine garantili yap işlet devret projelerinin ulaştırma yatırımları kapsamında değerlendirilmesi

    Evaluation of treasury guaranteed build operate transfer projects in Turkey within the scope of transportation investments

    İLHAMİ ÇAKIR

    Yüksek Lisans

    Türkçe

    Türkçe

    2023

    MaliyeTekirdağ Namık Kemal Üniversitesi

    Maliye Ana Bilim Dalı

    DOÇ. DR. SİMLA GÜZEL

  4. Implementation of toll road projects by build-operate-transfe model in Turkey

    Türkiye?de yap işlet devret modeliyle otoyol projelerinin yapılması

    AYMİR GAMZE KAYA

    Yüksek Lisans

    İngilizce

    İngilizce

    2010

    MimarlıkMimar Sinan Güzel Sanatlar Üniversitesi

    Yapı Mühendisliği Ana Bilim Dalı

    DOÇ. DR. SEMA ERGÖNÜL

  5. Yap-işlet-devret tipi inşaat projelerinde imtiyaz süresine etki eden faktörlerin belirlenmesi

    Determination of factors affecting concession period in build-operate-transfer type construction projects

    AHMET ÇENET

    Yüksek Lisans

    Türkçe

    Türkçe

    2021

    İnşaat MühendisliğiYıldız Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    DR. ÖĞR. ÜYESİ HANDE ALADAĞ