Stakeholder management on building informationmodeling projects: Design stage
Başlık çevirisi mevcut değil.
- Tez No: 723726
- Danışmanlar: DR. BİLGE ERDOGAN
- Tez Türü: Yüksek Lisans
- Konular: İnşaat Mühendisliği, Civil Engineering
- Anahtar Kelimeler: Building Information Modeling (BIM), Stakeholder Theory, Stakeholder management, Collaboration, Design stage
- Yıl: 2016
- Dil: İngilizce
- Üniversite: Herıot-Watt Unıversıty
- Enstitü: Yurtdışı Enstitü
- Ana Bilim Dalı: Belirtilmemiş.
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: Belirtilmemiş.
Özet
Özet yok.
Özet (Çeviri)
Building Information Modeling (BIM), a revolutionary innovation that can change traditional design and delivery of project formats, in combination with effective stakeholder management strategies are key areas in delivering successful project outcomes. Therefore, the purpose of this research is to investigate stakeholder management in the design stage of a project that utilizes BIM. The research aims to investigate the current use of stakeholder management on a project with BIM, understand the relationship between two topics and highlight specific BIM contributions on stakeholder management. Lastly, a series of recommendations are made to enhance the contribution that BIM can provide towards effective stakeholder management. Research was carried out in three phases. The first phase, a literature review, established the pertinent topics and provided the basis for the second phase, the primary data gathering phase. This was carried out by conducting a survey with construction professionals and stakeholders. The final phase assessed and quantified the data to understand the impact of BIM on stakeholder management and highlight specific strengths and weaknesses. Considering the literature review and the results of the survey, it is found that BIM has a positive impact on stakeholder management. Specifically, it is seen that there is a high level of BIM use with varying degrees of maturity levels. Furthermore, BIM was found to have significant positive impact on four critical success factors related to stakeholder management: analysing conflict, exploration of needs, understanding interests and communication and engagement. Consequently, the use of BIM has a potential to enhance stakeholder management strategies and provide more successful project outcomes compared to traditional project delivery approaches.
Benzer Tezler
- Yüksek teknoloji barındıran endüstri tesislerinin tasarım evresinde BİM destekli paydaş yönetimi: Ses altı rüzgâr tüneli örnek olay incelemesi
BİM-based stakeholder management in design phase of high-tech industrial facilities: A case study of subsonic wind tunnel
MUHAMMED YUSUF GÜNEŞ
Yüksek Lisans
Türkçe
2023
İnşaat Mühendisliğiİstanbul Teknik ÜniversitesiMimarlık Ana Bilim Dalı
PROF. DR. HAKAN YAMAN
- BIM kullanımının tasarım aşamasından kaynaklanan uyuşmazlıklar üzerine etkileri
Effects of using BIM on disputes arised from design process
HAKAN MURATOĞLU
Yüksek Lisans
Türkçe
2015
Mimarlıkİstanbul Teknik ÜniversitesiMimarlık Ana Bilim Dalı
DOÇ. DR. ELÇİN FİLİZ TAŞ
- Yapı bilgi modelleme süreçleri için algoritma destekli yaklaşım önerisi
Algorithm aided approach for the processes of building information modelling
ŞEYMANUR YILDIRIM
Yüksek Lisans
Türkçe
2017
Mimarlıkİstanbul Teknik ÜniversitesiBilişim Ana Bilim Dalı
YRD. DOÇ. DR. SEMA ALAÇAM
- Yapı bilgi modellemesi (BIM) ile robotik total statıonların aplikasyon ve imalat kontrolünde kullanımı
Usage of robotic total stations with application and manufacturing control with building information modeling (BIM)
TOLGA YÜCEL
Yüksek Lisans
Türkçe
2019
Mühendislik Bilimleriİstanbul Teknik ÜniversitesiGeomatik Mühendisliği Ana Bilim Dalı
PROF. DR. CENGİZHAN İPBÜKER
- Yapı bilgi modellemesinde kullanılan tasarım süreci aşamalandırma kavramlarının irdelenmesi
Examination of the design process phase concepts used in building information modeling
HİLAL DEVER
Yüksek Lisans
Türkçe
2022
MimarlıkMimar Sinan Güzel Sanatlar ÜniversitesiMimarlık Ana Bilim Dalı
DOÇ. DR. ÖMER ŞÜKRÜ DENİZ