Geri Dön

Site selection for floating photovoltaic (PV) panels on 8 HEPP reservoirs in Turkey by using analytical hierarchical process (AHP)

Türkiye'deki 8 HES rezervuarı üzerinde yüzer fotovoltaik (PV) paneller için analitik hiyerarşik proses (AHP) yöntemiyle yer seçimi

  1. Tez No: 765607
  2. Yazar: KAAN GÖLLÜ
  3. Danışmanlar: DOÇ. DR. ELİF OĞUZ
  4. Tez Türü: Yüksek Lisans
  5. Konular: İnşaat Mühendisliği, Enerji, Civil Engineering, Energy
  6. Anahtar Kelimeler: Analitik hiyerarşi süreci, Enerji, Fotovoltaik, Güneş enerjisi, Tesis yer seçimi, Yenilenebilir enerji, Çok kriterli karar verme, Analytical hierarchy process, Energy, Photovoltaic, Solar energy, Site selection, Renewable energy, Multi criteria decision making
  7. Yıl: 2022
  8. Dil: İngilizce
  9. Üniversite: Orta Doğu Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Yüzer Foto Voltaik (FPV) sistemlerden enerji üretimi, dünya çapında enerji talebinde giderek daha önemli bir rol oynaması beklenen, umut verici bir teknoloji alanıdır. FPV, elektrik altyapısını ve hidroelektrik santrallerini desteklerken mevcut enerji verimini artırabileceğinden geleneksel güneş enerjisine harika bir alternatiftir. Çok yönlü kriterleri kapsayan alan seçimi, FPV'lerin genel başarısını belirlemede kritik bir bileşendir. Bu çalışmanın amacı, Çok Ölçütlü Karar Verme yöntemlerinden biri olan Analitik Hiyerarşi Süreci ve Sıralı Ağırlıklı Ortalama yöntemi beraber kullanılarak, uygun alan seçimi analizi sunmaktır. Teknik, ekonomik ve sosyal alanlar ile ilgili 10 alan seçim kriteri belirlenmiş ve güneş enerjisi alanında uzman kişiler arasında anket çalışması yapılmıştır. Ardından, uzmanların kesin bir kararına varmak için, tutarlı anket sonuçları kullanılarak, fikir birliği analizi yapıldı. Bu analiz ile her bir alan seçim kriterinin göreceli ağırlıkları elde edildi. Daha sonra Türkiyenin farklı bölgelerinde, Yüzer Foto Voltaik sistem kurulabilecek rezervuara sahip 8 adet hidroelektrik santrali alternatif alan olarak belirlenmiştir. Ardından güneş enerjisi alanında uzman kişiler tarafından, her alternatif alanın, her bir seçim kriteri için kıyaslanmasının yapıldığı anket doldurulmuştur ve fikir birliği analizi yapılmıştır. Çalışmanın sonucunda, belirlenen her alanın FPV kurulumu için uygunluğu birbirine yakın görünse de, Aydın ilinde yer alan Kemer Hidroelektrik Santrali diğer alternatifler arasında en uygun alan olarak değerlendirilmiştir.

Özet (Çeviri)

Energy production from Floating Photo Voltaic (FPV) systems is a promising field of technology that is expected to play an increasingly significant role in worldwide energy demand. FPV is a great alternative to traditional solar energy since it can increase the existing energy yield while supporting the electrical infrastructure and hydropower stations. Encompassing multifaceted criteria, site selection is a critical component in determining the overall success of FPVs. The purpose of this study is to present a site selection suitability analysis using Analytical Hierarchy Process (AHP), which is one of the Multi-Criteria Decision Making (MCDM) methods combined with Ordered Weighted Averaging (OWA). 10 site selection criteria related to the technical, economic and social were identified and a questionnaire was conducted among the field experts of solar energy. Then, a consensus analysis was carried out using consistent questionnaire results to reach a definitive decision of experts. This analysis gives relative weights of each site selection criterion. After that, 8 Hydroelectrical Power Plants (HEPPs) having water reservoirs were selected in different locations of Turkey to establish Floating PVs. The solar energy experts filled another questionnaire to evaluate each selected site for each site selection criterion. Then a new consensus analysis is performed for selected sites. According to the result of the study, although every selected site's weight seems close to each other, Kemer HEPP, located in Aydın, Western Turkey, is found as the most feasible site among other alternatives to establish a Floating PV.

Benzer Tezler

  1. İlkokul çağı erkek çocuklarında inmemiş testis anomalisi ve insidansı

    The anomaly and incidence of cryptorchidism in primary school boys

    SERDAR SEZGİN

    Tıpta Uzmanlık

    Türkçe

    Türkçe

    1986

    Gazi Üniversitesi

    Üroloji Ana Bilim Dalı

    Yükleniyor...

  2. Effect of chymotrypsin on M1 type pyruvate kinase from rabbit muscle and L-type from sheep liver

    Başlık çevirisi yok

    NİLAY BAŞARAN

    Yüksek Lisans

    İngilizce

    İngilizce

    1987

    Orta Doğu Teknik Üniversitesi

    Biyokimya Ana Bilim Dalı

    Yükleniyor...

  3. Çukurova bölgesinde biyoklimatik veriler kullanılarak açık ve yeşil alan sistemlerinin belirlenmesi ilkeleri üzerinde bir araştırma

    A research on the determination of the principles in open and green spaces systems by using the bioclimatic data in Çukurova region

    MEHMET FARUK ALTUNKASA

    Doktora

    Türkçe

    Türkçe

    1987

    Çukurova Üniversitesi

    Peyzaj Mimarlığı Ana Bilim Dalı

    Yükleniyor...

  4. Çekirdeksiz kuru üzümde uygulanan politikanın Ege Bölgesinde üretim ve üretici açısından sonuçlarının değerlendirilmesi

    Başlık çevirisi yok

    GÜVEN ÖZERİN

    Doktora

    Türkçe

    Türkçe

    1986

    Ege Üniversitesi

    Tarım Ekonomisi Ana Bilim Dalı

    Yükleniyor...

  5. Böceklerde ışık meydana getirme

    Light emitting process in insects

    HALİL DÜNDAR

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Ege Üniversitesi

    Bitki Koruma Ana Bilim Dalı

    Yükleniyor...