Geri Dön

Risk management in construction projects

İnşaat projelerinde risk yönetimi

  1. Tez No: 768931
  2. Yazar: NOOR KHAMEES HUSSEIN HUSSEIN
  3. Danışmanlar: PROF. DR. TUNCER ÇELİK
  4. Tez Türü: Yüksek Lisans
  5. Konular: İnşaat Mühendisliği, Civil Engineering
  6. Anahtar Kelimeler: Kalite, Maliyet, Risk, Risk yönetimi, İnşaat projeleri, Quality, Cost, Risk, Risk management, Construction projects
  7. Yıl: 2022
  8. Dil: İngilizce
  9. Üniversite: Altınbaş Üniversitesi
  10. Enstitü: Lisansüstü Eğitim Enstitüsü
  11. Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: İnşaat Mühendisliği Bilim Dalı
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

İnşaat projeleri bu projelerin doğasından kaynaklanan karmaşıklık ile karakterize edilir, çünkü bu projeler mahremiyet ile karakterize edilir ve ekonomik ve politik yönlerden değişen bir çevrede uygulanır ve ayrıca hava faktörlerinden büyük ölçüde etkilenir. bu projeler uzun zaman alır ve bu nedenle bu projeler birçok İnşaat projesinin zamanında teslim edilememesi, kalite ve maliyet açısından hedeflerine ulaşamamasına neden olan birçok riske maruz kalmaktadır. proje için ana fatura, bu nedenle projenin ihtiyaçlarına göre uygulanması gerekmektedir. Bu nedenle, proje hedeflerine ulaşılmasını engelleyen engeller ve zorluklar (riskler) ile başa çıkmak için bilimsel bir metodoloji geliştirilmelidir. Bu çalışmanın amacı, temel riskleri ve bunların inşaat projeleri üzerindeki etkilerini belirlemek ve bu riskleri onlarla en çok başa çıkabilecek tarafa tahsis etmektir. Araştırmamız sonucunda, referans çalışmasına ve inşaat sektöründeki uzmanlarla ve proje sahibi gibi taraflarla yapılan bir dizi görüşmeye dayalı olarak inşaat projelerindeki en önemli riskler tespit edilmiştir. Katılımcılardan toplam 76 anket geri dönmüş ve böylece toplam cevaplama oranı %83,5 olmuştur. Bu nedenle, geri dönen anketlerden 4 tanesi bu eleme soruları nedeniyle tamamlanmamıştır. Sonuç olarak, toplam 72 anket tatmin edici bir şekilde doldurulmuş ve nicel analize göre geçerli olarak kabul edilmiştir. Veriler bir programda (IBM SPSS İstatistik 23) analiz edilerek riskler altı kategoriye (Finansman ve proje bütçesi, Güvenlik durum risk analizleri, Lojistik faktör riski, Yönetim Riski, Yasal Risk, Çevre Riski) ayrılmış ve şu sonuca varılmıştır: projenin amaçlarını etkileyen en önemli faktör finansman, en az ise çevredir.

Özet (Çeviri)

Construction projects are characterized by the complexity resulting from the nature of these projects, as these projects are characterized by privacy and are implemented within a changing environment in terms of economic and political aspects, as well as greatly affected by weather factors, and the implementation of these projects takes a long period of time, and thus these projects are exposed to many risks that cause the failure of many Construction projects from delivering them on deadlines and achieving their goals in terms of quality and cost the project owner is the party that pays the main bill for the project, so it is necessary that the project be implemented according to its needs. For this reason, a scientific methodology must be developed to deal with obstacles and challenges (risks) that impede the achievement of the project objectives. The aim of this study is to identify the main risks and their effects on construction projects and allocate these risks to the party most able to deal with them. through our research, the most important risks in construction projects were identified, based on the reference study and a number of interviews with experts in the construction industry and with parties such as the project owner. A total of 76 questionnaires were returned from the respondents, and thus the total response rate was 83.5%. Hence, 4 of the returned questionnaires were not completed due to these eliminating questions. As a result, a total of 72 questionnaires were satisfactorily completed and recognized as valid in accordance with quantitative analysis. The data was analysed in a program (IBM SPSS Statistics 23) the risks were divided into six categories (Funding and project budget, Security situation risks analyses, Logistical factors risk, Administration Risk, Legal Risk, Environment Risk) including and it was concluded that the most important one affecting the objectives of the project is financing, and the least one is the environment

Benzer Tezler

  1. Savunma sanayii işletmelerinde savunma programları ve maliyet yapıları

    Başlık çevirisi yok

    HASAN A. YEŞİLOĞLU

    Doktora

    Türkçe

    Türkçe

    1990

    İşletmeAnkara Üniversitesi

    PROF.DR. YÜKSEL YALKIN(KOÇ)

  2. Proje yönetimi

    Project management

    ALİRIZA GANİOĞLU

    Yüksek Lisans

    Türkçe

    Türkçe

    1991

    İşletmeİstanbul Teknik Üniversitesi

    DOÇ.DR. HALUK ERKUT

  3. Ekip planlama

    Airline crew scheduling

    ELİF AYAN

    Yüksek Lisans

    Türkçe

    Türkçe

    1991

    Ulaşımİstanbul Teknik Üniversitesi

    DOÇ.DR. MEHMET TANYAŞ

  4. Hekimbaşı Çiftliği Kasrı restorasyon projesi

    The Restoration project of the Mansion of Hekimbaşı Estate

    H.ZÜMRÜT BAYRAKTAROĞLU

    Yüksek Lisans

    Türkçe

    Türkçe

    1991

    Mimarlıkİstanbul Teknik Üniversitesi

    PROF.DR. ZEYNEP AHUNBAY

  5. Kaynak kısıtlı proje planlamada yöntemler ve uygulamalar

    Methods and applications in resource constrainet project planning

    F. ATİLLA DİREN

    Yüksek Lisans

    Türkçe

    Türkçe

    1991

    Endüstri ve Endüstri Mühendisliğiİstanbul Teknik Üniversitesi

    PROF.DR. ATAÇ SOYSAL

  6. Risk yönetimi ve inşaat sigortaları

    Başlık çevirisi yok

    BETÜL ARISOY

    Yüksek Lisans

    Türkçe

    Türkçe

    1992

    SigortacılıkMarmara Üniversitesi

    PROF.DR. İSMET BARUTCUGİL