Geri Dön

Jeoistatistiksel yöntemle potansiyel mermer yatağının işletilebilirliğinin değerlendirilmesi ve üretim planlaması

Evaluation of the operability of potential marble deposit and production planning by geostatistical method

  1. Tez No: 778639
  2. Yazar: EMRE BERBER
  3. Danışmanlar: DR. ÖĞR. ÜYESİ ALAATTİN SAKCALI
  4. Tez Türü: Yüksek Lisans
  5. Konular: Jeoloji Mühendisliği, Maden Mühendisliği ve Madencilik, Geological Engineering, Mining Engineering and Mining
  6. Anahtar Kelimeler: Jeoistatistik, Mermer endüstrisi, Mermer ocakları, Rezerv, Üretim planlaması, Geostatistics, Marble industry, Marble quarries, Reserve, Production planning
  7. Yıl: 2023
  8. Dil: Türkçe
  9. Üniversite: Atatürk Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Jeoloji Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Amaç: Bu çalışmada daha önce işletilen ve üretimi duran potansiyel bir mermer yatağı ele alınmıştır. Bahsi geçen mermer yatağı koyuluk derecesi, doku ve kaya kalite belirteci (RQD)'ne göre jeoistatistiksel yöntemlerle analiz edilmiştir. Çalışmanın temel amacı joeistatistiksel analizlerden faydalanılarak bir potansiyel mermer yatağının işletilebilirliğinin değerlendirilmesi ve ekonomik durum göz önünde bulundurularak üretim planlaması yapılmasıdır. Yöntem: Çalışma saha, analiz ve değerlendirme olmak üzere üç aşamada gerçekleştirilmiştir. İlk olarak sahada karotlu sondaj faaliyetine nezaret edilerek jeoistatistiksel analiz aşamasında kullanılacak veriler alınmıştır. Saha çalışmalarında karotların koyuluk derecesi, doku ve RQD değerleri belirlenmiştir. Bu değerler kullanılarak jeoistatistiksel analizler gerçekleştirilmiştir. Jeoistatistiksel analiz verileriyle üretim planlaması ve elde edilecek gelir tahmini için değerlendirmeler yapılmıştır. Bulgular: Çalışmaya örnek olarak seçilen mermer ocağının doku, koyuluk derecesi ve RQD değeri kullanılarak bu değerlerin mermer yatağındaki dağılımı jeoistatistiksel analizler ile incelenmiştir. Doku türü katı model ile verilirken koyuluk derecesi ve RQD değerine göre blok modeller oluşturulmuştur. Mermer yatağının genel bir değerlendirmesinin ardından blok model verileri kullanılarak ocakta üretim planlaması yapılmıştır. Planlanan üretim sonucunda elde edilecek mermer blok ve gelir miktarı tahmin edilmiştir. Sonuç: Potansiyel bir mermer yatağının değerlendirilmesi ve üretim planlamasında jeoistatistiksel analizlerin yardımcı bir araç olarak kullanılabileceği belirlenmiştir. Ayrıca jeoistatistiksel analizlerden elde edilen veriler kullanılarak planlanan üretimin gerçekleştirilmesi halinde elde edilecek rezerv ve gelirin tahmin edilebileceği ortaya konmuştur.

Özet (Çeviri)

Purpose: In this study, a potential marble deposit that was previously operated and stopped in production was discussed. The aforementioned marble deposit was analyzed by geostatistical methods according to the degree of darkness, texture and Rock Quality Designation (RQD). The main purpose of the study is to evaluate the operability of a potential marble deposit by making use of geostatistical analyzes and to make production planning by considering the economic situation. Method: The study was carried out in three stages which are field, analysis and evaluation. First of all, the data to be used in the geostatistical analysis phase were obtained by overseeing the core drilling activity in the field. In field studies, the degree of darkness, texture and RQD values of the cores were determined. The geostatistical analyzes were carried out by using these values. The evaluations were made for production planning and estimation of the income to be obtained with the geostatistical analysis data. Findings: By using the texture, degree of darkness and RQD value of the selected marble quarry as an example for the study, the distribution of these values in the marble deposit was investigated by geostatistical analysis. While the texture type was given with the solid model, block models were formed according to the degree of darkness and RQD value. After a general evaluation of the marble deposit, production planning was made in the quarry by using block model data. The amount of marble block and income to be obtained as a result of the planned production has been estimated. Results: It has been determined that the geostatistical analyzes can be used as an auxiliary tool in the evaluation and production planning of a potential marble deposit. In addition, it has been revealed that the reserve and income that will be obtained in case of realization of the planned production can be estimated by using the data obtained from geostatistical analyzes.

Benzer Tezler

  1. Çukurova yöresindeki yaygın toprak serilerinin bazı fiziksel ve kimyasal özelliklerinin değişim tavırlarının irdelenmesi

    Başlık çevirisi yok

    HARUN KÖKSAL

    Yüksek Lisans

    Türkçe

    Türkçe

    1988

    Çukurova Üniversitesi

    Kültürteknik Ana Bilim Dalı

    Yükleniyor...

  2. Correlation of geotechnical parameters of the İzmir sewerage plant site area

    İzmir kanalizasyon arıtma tesisi sahasında jeoteknik parametrelerin korelasyonu

    TÜRKER ONUR

    Yüksek Lisans

    İngilizce

    İngilizce

    1989

    Orta Doğu Teknik Üniversitesi

    Yükleniyor...

  3. Geostatistical evaluation of the Gümüşköy silver deposit (Kütahya-Turkey)

    Başlık çevirisi yok

    AZİZ MUSA PARLAKYİĞİT

    Doktora

    İngilizce

    İngilizce

    1989

    Orta Doğu Teknik Üniversitesi

    Yükleniyor...

  4. Payas bölgesi (Hatay) demirli boksit oluşumlarının kökenine yönelik jeokimyasal ve maden mikroskopik incelemeler

    The Geochemical and ore microscopic investigations of payas region (Hatay) ferric bauxite occurrences and their genesis

    MEHMET ALİ DEĞER

    Yüksek Lisans

    Türkçe

    Türkçe

    1991

    Ankara Üniversitesi

    Yükleniyor...