Geri Dön

Cost estimation for building construction projects using anartificial neural network (ANN)

Başlık çevirisi mevcut değil.

  1. Tez No: 798285
  2. Yazar: NOORALHUDA ALABDALI
  3. Danışmanlar: DR. ÖĞR. ÜYESİ SEYED MOHSEN SEYEDI VIAND
  4. Tez Türü: Yüksek Lisans
  5. Konular: İnşaat Mühendisliği, Civil Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2022
  8. Dil: İngilizce
  9. Üniversite: Altınbaş Üniversitesi
  10. Enstitü: Lisansüstü Eğitim Enstitüsü
  11. Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 88

Özet

Managers of projects monitor the project schedule and compare planning values with the actual cost into the project and how much of it is earned value. One of success methods for managing the construction projects is to find the effective cost factors and investigate the correlations between them. In order to determine the discrepancies, the Execution Phase performance measures are compared to the baseline metrics decided upon in the Planning Phase. The significance of these deviations is assessed by factoring them into the control methods at every stage. For that, the present paper developed an ANN technique for project management to monitor the cost of project based on the correlation between the project size and the project cite area within the implementation process. The contribution in this paper is to present a project planning cost mimic the real actual cost. Modifications to the project can be monitored using this method, which takes into account both the nature of the work being done and the time frame during which it is being performed. To gauge the system's efficacy, the ANN system was applied to structural concrete and building walls. The system's final output demonstrated a straightforward and reliable method of tracking and observing progress.

Özet (Çeviri)

Managers of projects monitor the project schedule and compare planning values with the actual cost into the project and how much of it is earned value. One of success methods for managing the construction projects is to find the effective cost factors and investigate the correlations between them. In order to determine the discrepancies, the Execution Phase performance measures are compared to the baseline metrics decided upon in the Planning Phase. The significance of these deviations is assessed by factoring them into the control methods at every stage. For that, the present paper developed an ANN technique for project management to monitor the cost of project based on the correlation between the project size and the project cite area within the implementation process. The contribution in this paper is to present a project planning cost mimic the real actual cost. Modifications to the project can be monitored using this method, which takes into account both the nature of the work being done and the time frame during which it is being performed. To gauge the system's efficacy, the ANN system was applied to structural concrete and building walls. The system's final output demonstrated a straightforward and reliable method of tracking and observing progress.

Benzer Tezler

  1. Cost estimation for building construction projects using an artificial neural network (ANN)

    Başlık çevirisi yok

    ZAİNULABDEEN ALİ ALTAHER

    Yüksek Lisans

    İngilizce

    İngilizce

    2023

    İnşaat MühendisliğiAltınbaş Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    DOÇ. DR. SEPANTA NAİMİ

  2. Developing a sustainable building construction management model using artificial neural network method

    YAPAY SİNİR AĞLARI YÖNTEMİ KULLANARAK SÜRDÜRÜLEBİLİR BİNA İNŞAAT YÖNETİM MODELİNİN GELİŞTİRİLMESİ

    HALAH ALBASRI

    Yüksek Lisans

    İngilizce

    İngilizce

    2023

    İnşaat MühendisliğiAltınbaş Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    PROF. DR. SEPANTA NAİMİ

  3. Kamu bina inşaat ihalelerinde sözleşme bedelinin yapay zeka teknikleri ile belirlenmesi

    Determination of contract price with artificial intelligence methods in public construction tenders

    ESRA DOBRUCALI

    Doktora

    Türkçe

    Türkçe

    2018

    İnşaat MühendisliğiSakarya Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    DR. ÖĞR. ÜYESİ İSMAİL HAKKI DEMİR

  4. Leveraging ai in construction management

    İnşaat proje yönetiminde yapay zekadan faydalanma

    BARAN AKOL

    Yüksek Lisans

    İngilizce

    İngilizce

    2024

    Mimarlıkİstanbul Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    DOÇ. DR. FATMA PINAR ÇAKMAK

  5. Estimation and analysis of building costs using artificial intelligence support vector machine

    Başlık çevirisi yok

    ZAHRA SALAHALDAIN ABDULJABAR

    Yüksek Lisans

    İngilizce

    İngilizce

    2023

    İnşaat MühendisliğiAltınbaş Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    DOÇ. DR. SEPANTA NAİMİ