Cost estimation for building construction projects using anartificial neural network (ANN)
Başlık çevirisi mevcut değil.
- Tez No: 798285
- Danışmanlar: DR. ÖĞR. ÜYESİ SEYED MOHSEN SEYEDI VIAND
- Tez Türü: Yüksek Lisans
- Konular: İnşaat Mühendisliği, Civil Engineering
- Anahtar Kelimeler: Belirtilmemiş.
- Yıl: 2022
- Dil: İngilizce
- Üniversite: Altınbaş Üniversitesi
- Enstitü: Lisansüstü Eğitim Enstitüsü
- Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: 88
Özet
Managers of projects monitor the project schedule and compare planning values with the actual cost into the project and how much of it is earned value. One of success methods for managing the construction projects is to find the effective cost factors and investigate the correlations between them. In order to determine the discrepancies, the Execution Phase performance measures are compared to the baseline metrics decided upon in the Planning Phase. The significance of these deviations is assessed by factoring them into the control methods at every stage. For that, the present paper developed an ANN technique for project management to monitor the cost of project based on the correlation between the project size and the project cite area within the implementation process. The contribution in this paper is to present a project planning cost mimic the real actual cost. Modifications to the project can be monitored using this method, which takes into account both the nature of the work being done and the time frame during which it is being performed. To gauge the system's efficacy, the ANN system was applied to structural concrete and building walls. The system's final output demonstrated a straightforward and reliable method of tracking and observing progress.
Özet (Çeviri)
Managers of projects monitor the project schedule and compare planning values with the actual cost into the project and how much of it is earned value. One of success methods for managing the construction projects is to find the effective cost factors and investigate the correlations between them. In order to determine the discrepancies, the Execution Phase performance measures are compared to the baseline metrics decided upon in the Planning Phase. The significance of these deviations is assessed by factoring them into the control methods at every stage. For that, the present paper developed an ANN technique for project management to monitor the cost of project based on the correlation between the project size and the project cite area within the implementation process. The contribution in this paper is to present a project planning cost mimic the real actual cost. Modifications to the project can be monitored using this method, which takes into account both the nature of the work being done and the time frame during which it is being performed. To gauge the system's efficacy, the ANN system was applied to structural concrete and building walls. The system's final output demonstrated a straightforward and reliable method of tracking and observing progress.
Benzer Tezler
- Cost estimation for building construction projects using an artificial neural network (ANN)
Başlık çevirisi yok
ZAİNULABDEEN ALİ ALTAHER
Yüksek Lisans
İngilizce
2023
İnşaat MühendisliğiAltınbaş Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
DOÇ. DR. SEPANTA NAİMİ
- Developing a sustainable building construction management model using artificial neural network method
YAPAY SİNİR AĞLARI YÖNTEMİ KULLANARAK SÜRDÜRÜLEBİLİR BİNA İNŞAAT YÖNETİM MODELİNİN GELİŞTİRİLMESİ
HALAH ALBASRI
Yüksek Lisans
İngilizce
2023
İnşaat MühendisliğiAltınbaş Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
PROF. DR. SEPANTA NAİMİ
- Kamu bina inşaat ihalelerinde sözleşme bedelinin yapay zeka teknikleri ile belirlenmesi
Determination of contract price with artificial intelligence methods in public construction tenders
ESRA DOBRUCALI
Doktora
Türkçe
2018
İnşaat MühendisliğiSakarya Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
DR. ÖĞR. ÜYESİ İSMAİL HAKKI DEMİR
- Leveraging ai in construction management
İnşaat proje yönetiminde yapay zekadan faydalanma
BARAN AKOL
Yüksek Lisans
İngilizce
2024
Mimarlıkİstanbul Teknik ÜniversitesiMimarlık Ana Bilim Dalı
DOÇ. DR. FATMA PINAR ÇAKMAK
- Estimation and analysis of building costs using artificial intelligence support vector machine
Başlık çevirisi yok
ZAHRA SALAHALDAIN ABDULJABAR
Yüksek Lisans
İngilizce
2023
İnşaat MühendisliğiAltınbaş Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
DOÇ. DR. SEPANTA NAİMİ