Experimental investigation of MRP and PBC in a flexible manufacturing cell with an automated storage and retrieval system
Malzeme gereksinimleri planlaması ve dönem kafilesi kontrolünün otomatik depolama sistemi ile donatılmış bir esnek üretim hücresinde deneysel incelemesi
- Tez No: 90677
- Danışmanlar: DOÇ. DR. NUR EVİN ÖZDEMİREL, DOÇ. DR. SİNAN KAYALIGİL
- Tez Türü: Yüksek Lisans
- Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
- Anahtar Kelimeler: Malzeme Gereksinimleri Planlaması, Dönem Kafilesi Kontrolü, Üretim Planlama ve Kontrol, Esnek Üretim Hücreleri IV 1G YÜKSEKÖĞRETİM KURULU BOK@MANl»SyO!t MERKEZİ, Material Requirements Planning, Period Batch Control, Production Planning and Control, Flexible Manufacturing Cells m
- Yıl: 1999
- Dil: İngilizce
- Üniversite: Orta Doğu Teknik Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: 172
Özet
oz MALZEME GEREKSİNİMLERİ PLANLAMASI VE DÖNEM KAFİLESİ KONTROLÜ'NÜN OTOMATİK DEPOLAMA SİSTEMİ İLE DONATILMIŞ BİR ESNEK ÜRETİM HÜCRESİNDE DENEYSEL İNCELEMESİ Düşmez, Elif Yüksek Lisans, Endüstri Mühendisliği Bölümü Tez Yöneticisi: Dr. Nur Evin Özdemirel Yardımcı Tez Yöneticisi: Dr. Sinan Kayalıgil Aralık 1999, 162 sayfa Hücresel yapılarda esnek üretim son yirmi yıl içerisinde önem kazandı ve otomasyonun malzeme yönetimi üzerindeki etkisi araştırmacılardan büyük ilgi gördü. Bu çalışmada, Malzeme Gereksinimleri Planlaması ve Dönem Kafilesi Kontrolü adındaki iki malzeme planlama yönteminin bir esnek üretim hücresinin performansı üzerindeki etkileri analiz edilmiştir. Üretim hücresini oluşturan fiziksel sistem otomatik malzeme taşıma gereçleri ve bir otomatik depolama sistemi ile donatılmış olan gerçek bir fiziksel simulatörden adapte edilmiştir. Bu sistemin, parça üretimi ve montaj operasyonlarının gerçekleştirildiği bir hücresel üretim sistemini temsil eden bir ortamda çalıştığı varsayılmıştır. Malzeme Gereksinimleri Planlaması ve Dönem Kafilesi Kontrolü'nün performansları değişik toplam talep değişim düzeyleri ve değişik seviyelerdeki parça ortaklığı ve parça kapsamı ile karakterize edilebilen değişik malzeme listesi yapılan altmda ölçülmüştür. Ortalama gecikme düzeyleri, taşman envanter ve kritik kaynakların kullanım oranlan performans ölçütleri olarak kullanılmıştır. Sistem, simulasyon analizi kullanılarak modellenmiş ve analiz edilmiştir. Sonuçlar, toplam talep değişiminin sistemin performansında kritik bir faktör olduğunu göstermiştir. Malzeme Gereksinimleri Planlaması sistemdeki değişikliklere çabuk reaksiyon gösterdiği için toplam talep değişiminin yüksek olduğu durumda parça üretimi için ortalama akış zamanı ve gecikme ölçütlerine göre daha kötü performans göstermiştir. Dönem Kafilesi Kontrolü'nde yüksek envanter düzeyleri gözlemlenmiştir ve bu da parça üretimi ve montaj aşamalan arasındaki fazla depolama ihtiyacı yüzünden montaj operasyonunun performansını kötü yönde etkilemiştir. MRP'de daha iyi kaynak kullanımı gözlenmiştir.
Özet (Çeviri)
ABSTRACT EXPERIMENTAL INVESTIGATION OF MRP AND PBC IN A FLEXIBLE MANUFACTURING CELL WITH AN AUTOMATED STORAGE AND RETRIEVAL SYSTEM Düşmez, Elif M.S., Department of Industrial Engineering Supervisor: Dr. Nur Evin Özdemirel Co-Supervisor: Dr. Sinan Kayalıgil December 1999, 162 pages Flexible manufacturing in cellular settings has gained importance in the last two decades and the effect of automation in material management has raised a lot of interest among the researchers. In this study, the effect of two detailed material planning schemes, Material Requirements Planning (MRP) and Period Batch Control (PBC), on the performance of a flexible manufacturing cell is analyzed. The physical system constituting the manufacturing cell is adopted from an existing physical simulator, which consists of automated material handling equipment and an automated storage and retrieval system. This system is assumed to operate in an environment representative of a system of manufacturing cells where component manufacturing and assembly operations are carried out. The performance of MRP and PBC is measured at different total demand volume variation levels and different BOM structures characterized by different levels of parts commonality and range of components. Average tardiness levels, amount of inventory carried and utilization of critical resources are used as the performance measures. System simulation is used to model and analyze the system. The results reveal that the total demand volume variation is a critical factor in system performance. MRP performed worse under high volume variation in terms of average flowtime and tardiness at component manufacturing due to the need for quick reaction to changes in the system. High inventory levels are observed under PBC and this affects the performance of assembly operation adversely due to high storage requirement between component manufacturing and assembly stages. Better resource utilizations were observed in MRP than in PBC.
Benzer Tezler
- Experimental investigation of hydroxy gas enriched natural gas as an alternative fuel (HHO-CNG) in pilot injection diesel engines
Hidroksi gaz ile zenginleştirilmiş doğalgazın (HHO-CNG) pilot püskürtmeli dizel motorlarda alternatif yakıt olarak kullanılması
HÜSEYİN TURAN ARAT
Doktora
İngilizce
2016
EnerjiÇukurova ÜniversitesiMakine Mühendisliği Ana Bilim Dalı
PROF. DR. KADİR AYDIN
- Atık lastiklerin taş/kum kolon uygulamalarında kullanılmasının deneysel olarak incelenmesi
Experimental investigation of the use of waste tires in stone/sand column applications
CAN ERENSON
Yüksek Lisans
Türkçe
2015
İnşaat MühendisliğiAksaray Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
DOÇ. DR. NİYAZİ UĞUR TERZİ
- Hibrit yıkayıcı/kurutucu için spreyle nem alma sürecinin deneysel incelenmesi
Experimental investigation of spray dehumidification process for hybrid washing/drying machine
SEMRA GÜMRÜK
Yüksek Lisans
Türkçe
2015
Makine MühendisliğiTOBB Ekonomi ve Teknoloji ÜniversitesiMakine Mühendisliği Ana Bilim Dalı
DOÇ. DR. MURAT KADRİ AKTAŞ
- Experimental investigation of the failure of air plasma sprayed thermal barrier coatings
Hava plazma sprey ısıl bariyer kaplamaların kırılmasının deneysel incelenmesi
BAŞAR KÜTÜKOĞLU
Yüksek Lisans
İngilizce
2015
Havacılık MühendisliğiOrta Doğu Teknik ÜniversitesiHavacılık ve Uzay Mühendisliği Ana Bilim Dalı
DOÇ. DR. DEMİRKAN ÇÖKER
- Experimental investigation of morphing wing aerodynamics by force measurements and particle image velocimetry
Şekil değiştirebilen kanat aerodinamiğinin kuvvet ölçümleri ve parçacık görüntüleme tekniği ile deneysel olarak incelenmesi
ÖZGE SİNEM ÖZÇAKMAK
Yüksek Lisans
İngilizce
2015
Havacılık MühendisliğiOrta Doğu Teknik ÜniversitesiHavacılık ve Uzay Mühendisliği Ana Bilim Dalı
PROF. DR. SERKAN ÖZGEN