Parallel machine scheduling problem with eligibility constraints in a tobacco company

Tütün sektöründe faaliyet gösteren bir işletmede uygunluk kısıtlı paralel makine çizelgeleme problemi

  1. Tez No: 928422
  2. Yazar: BURCU HAMAN
  3. Danışmanlar: PROF. DR. ZEKİ CANER TAŞKIN, DOÇ. DR. ALİ TAMER ÜNAL
  4. Tez Türü: Yüksek Lisans
  5. Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2024
  8. Dil: Türkçe
  9. Üniversite: Boğaziçi Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Çizelgeleme, birçok endüstriyel firma için zaman, işgücü/ekipman kullanımı ve maliyet açısından önemli sonuçlar ortaya koyan bir optimizasyon problemidir. Son yıllarda azalan malzeme maliyetleri ve teknolojinin gelişmesiyle birlikte piyasada artan rekabet nedeniyle tesislerde harcanan ekstra zaman çok önemli hale gelmiştir. Bu nedenle işin daha kısa sürede yapılabilmesi için planlama ve çizelgeleme ön plana çıkmaktadır. Bu tezde tütün üretim sektöründe faaliyet gösteren paralel makine üretim akışına sahip bir sigara üretim tesisinde karışık tamsayılı doğrusal programlama ile bir çizelgeleme problemi çözülmüştür. Bu çalışma gerçek hayat problemi olup çözümde kullanılacak veriler tezin yürütüldüğü fabrikadan alınmıştır. Problemin birinci amacı işlerin geç kalma süresini minimize etmek, ikincisi ise tamamlanma süresini azaltmaktır. Gecikme ve tamamlanma süresi minimizasyonu için incelenen 92 makalede kullanılan modeller literatür taramasında sunulmuştur. Bu projede işletme bünyesinde bulunan 19 adet paralel akış tipine göre gelen sipariş sırasına göre çizelgelenmiş ve matematiksel modeli kurulmuştur. Kurulan karma tamsayılı doğrusal programlama modeli Python yazılımında (Pycharm) Gurobi çözücüsü ile gurobipy kütüphanesi kullanılarak çözülmüştür. Proje çıktısı olarak, üretim ve üretim planlama ekibinin hafta başında kullanacağı haftalık üretim planı Gantt şeması şeklinde sunulmuştur. Modelin bir diğer çıktısı olarak, makinelerin sorun yaşaması nedeniyle mevcut plandan sapmalar olduğunda, model yeni bir çıktı sağlıyor ve Gantt şeması kullanıcıya tekrar sunmaktadır. Bu sayede kullanıcı dostu, esnek ve her işletmeye göre şekillendirilebilecek bir çizelgeleme oluşturulmuş olacak ve işletme tarafından da uygun şekilde kullanılabilecektir.

Özet (Çeviri)

Scheduling is an optimization problem that shows significant results in terms of time, labor/equipment usage and cost for many industrial companies. In recent years, due to decreasing material costs and increasing competition in the market with the development of technology, extra time spent in facilities has become very important. Therefore, planning and scheduling come to the fore in order to get the job done in a shorter time. In this thesis, a scheduling problem is solved with mixed integer linear programming in a cigarette production facility with a parallel machine production flow operating in the tobacco production sector. This study is a real life problem and the data to be used in the solution are taken from the factory where the thesis is carried out. The first purpose of the problem is to minimize the tardiness of jobs and the second one is decreasing completion time. Models used in 92 articles investigated for tardiness and completion time minimization are presented in the literature review. In this thesis, the 19 parallel machines within the enterprise were scheduled according to the incoming filter order and their mathematical model was established. The established mixed integer linear programming model solves using the gurobipy library with Gurobi solver in Python software. As a thesis output, a weekly production plan to be used by the production and production planning team at the beginning of the week presents in the form of a Gantt chart. As another output of the model, when there are deviations from the current plan due to the machines having problems, the model provides a new output and the Gantt chart will be presented to the user again. In this way, a scheduling creates that is user-friendly, flexible and can be shaped according to every business and will also be used by the business by using the appropriate term and resources.

Benzer Tezler

  1. İzmir'de Mustafa Kemal Bulvarı'nın peyzaj mimarlığı açısından etüdü ve peyzaj projesi

    Başlık çevirisi yok

    ENGİN ALPARSLAN

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Peyzaj Mimarlığı Ana Bilim Dalı

    Yükleniyor...

  2. Çocuklarda akut stres hiperglisemisinde hormonal değişikliklerin ve kısa süreli prognozun incelenmesi

    Başlık çevirisi yok

    AYGÜN DİNDAR

    Tıpta Uzmanlık

    Türkçe

    Türkçe

    1987

    İstanbul Üniversitesi

    Çocuk Sağlığı ve Hastalıkları Hemşireliği Ana Bilim Dalı

    Yükleniyor...

  3. Değişik derim zamanı ve önsoğutmanın Bursa siyahı incir çeşidinin meyve kalitesi ve pazarlama süresi üzerine etkileri

    Effects of haruest time and precooling on fruit quality and shelf-life of the fig variety“Bursa siyahı”

    FÜSUN GÜRSEL ÇELİKEL

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Bahçe Bitkileri Ana Bilim Dalı

    Yükleniyor...

  4. Dislokasyon-dislokasyon etkileşimi

    Başlık çevirisi yok

    YILDIRIM AYDOĞDU

    Yüksek Lisans

    Türkçe

    Türkçe

    1987

    İnönü Üniversitesi

    Fizik Ana Bilim Dalı

    Yükleniyor...

  5. Küçük Yamanlar tepesi örneğinde kent yakın çevresinde rekreasyon alanı düzenleme projesi

    Başlık çevirisi yok

    NİHAN BULGUN

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Peyzaj Mimarlığı Ana Bilim Dalı

    Yükleniyor...