Afet sonrası yeniden yapılanma projelerinde toplum ve dirençlilik odaklı yüklenici seçim modeli

Developing community driven resilient contractor selection model in post-disaster reconstruction projects

  1. Tez No: 944945
  2. Yazar: FEHMİ SAMET DEMİRCİ
  3. Danışmanlar: PROF. DR. ZEYNEP IŞIK
  4. Tez Türü: Yüksek Lisans
  5. Konular: İnşaat Mühendisliği, Civil Engineering
  6. Anahtar Kelimeler: Afet sonrası yeniden yapılanma, yüklenici seçimi, dirençli yeniden yapılanma, build back better, bütünleşmiş BBWM-bulanık VIKOR, Post-disaster reconstruction, contractor selection, resilient reconstruction, build back better, integrated BBWM-fuzzy VIKOR
  7. Yıl: 2025
  8. Dil: Türkçe
  9. Üniversite: Yıldız Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Yapı İşletmesi Bilim Dalı
  13. Sayfa Sayısı: 93

Özet

Günümüzde sıklığı ve şiddeti giderek artan afetler, toplumun çevresel, ekonomik ve sosyal koşullarını tahrip etmektedir. Geleneksel inşaat projelerinden farklı olarak, afet sonrası yeniden yapılandırma projeleri, afetlerin neden olduğu belirsizlikler ve toplum kaygılarının önceliklendirilmesi nedeniyle kendine özgüdür. Bu nedenle yükleniciler, yeniden yapılanma projelerinin özel ihtiyaçlarını karşılayabilecek şekilde seçilmelidir. Bu bağlamda bu çalışma,“build back better (BBB)”yaklaşımını kullanarak afet sonrası yeniden inşa projelerinde toplum kaygılarını da dikkate alan dirençli bir yüklenici seçim modeli geliştirmeyi amaçlamaktadır. Başlangıçta, modeli geliştirmek için kapsamlı bir literatür taraması yapılmıştır. Bu literatür taraması sırasında bir dizi yüklenici seçim kriteri belirlenmiştir. Daha sonra belirlenen kriterleri gözden geçirmek ve iyileştirmek için odak grup görüşmesi (OGG) oturumları düzenlenmiştir. Sonuç olarak, 39 seçim kriterinden oluşan nihai bir liste geliştirilmiştir. Ardından, her bir seçim kriterinin ağırlıklarını belirlemek için Bayesian Best Worst Metodu (BBWM) uygulanmıştır. Son olarak, önerilen model varsayımsal bir vaka çalışması ve bulanık VlseKriterijuska Optimizacija I Komoromisno Resenje (VIKOR) analizi yapılarak doğrulanmıştır. Ayrıca, modeldeki maksimum grup faydası (v) değerinin etkisini incelemek için bir duyarlılık analizi yapılmıştır Sonuçlar, afet sonrası yeniden yapılandırma projelerinde yüklenicilerin yalnızca“teknik”ve“ekonomik”faktörlere dayalı olarak seçilemeyeceğini vurgulamıştır. Bunun yerine,“organizasyonel ve yönetimsel”,“çevresel sürdürülebilirlik”,“kaynak yönetimi ve tedarik”ve“son kullanıcı”gibi diğer unsurlar da dikkate alınmalıdır. İkinci olarak, finansal güç, deneyim, risk yönetimi, enerji verimliliği, kaynak mevcudiyeti ve güvence ile ilgili faktörler, özellikle karar vericilerin ayrıntılı dikkatini gerektiren en önemli faktörler olarak görülmüştür. Son olarak, vaka çalışması, önerilen modelin afet sonrası yeniden inşa projelerinde yüklenici seçim süreçlerini sistematik hale getirmek için önemli bir potansiyele sahip olduğunu ortaya koymuştur.

Özet (Çeviri)

Disasters, which are increasing in frequency and severity today, devastate the community's environmental, economic and social conditions. Unlike traditional construction projects, post-disaster reconstruction projects are distinctive due to the uncertainties caused by the disasters and the prioritization of community concerns. Therefore, contractors should be selected in a way that can meet the specific needs of reconstruction projects. In this context this study aims to develop a resilient contractor selection model that also considers community concerns in post-disaster reconstruction projects using a“build-back better (BBB)”approach. At the outset, a comprehensive literature review was conducted to develop the model. During this literature review, a set of contractor selection criteria were identified. Focus group discussion (FGD) sessions were then organized to revise and refine the identified criteria. As a result, a final list of 39 selection criteria were developed. Next, the Bayesian best worst method (BBWM) was conducted to determine the weights of each selection criterion. Finally, the proposed model was validated by conducting a hypothetical case study and fuzzy VlseKriterijuska Optimizacija I Komoromisno Resenje (fuzzy VIKOR) analysis. Moreover, a sensitivity analysis was conducted to examine the effect of the maximum group utility (v) value in the model The results emphasized that contractors in post-disaster reconstruction projects cannot be selected merely based on“technical”and“economic”factors. Instead, the other aspects, namely“organizational and managerial,”“environmental sustainability,”“resource management and procurement”and“end-user,”should also be taken into consideration. Second, factors related to financial strength, experience, risk management, energy efficiency, resource availability and assurance were particularly deemed the most significant, needing the detailed attention of the decision-makers. Lastly, the case study revealed that the proposed model has a significant potential to systemize contractor selection processes in post-disaster reconstruction projects.

Benzer Tezler

  1. Turkey's role in Afghanistan in the post 9/11 era

    11 Eylül'den günümüze Türkiye'nin Afganistan'daki rolü

    CANAN BAYRAM ÇUBUK

    Yüksek Lisans

    İngilizce

    İngilizce

    2014

    Uluslararası İlişkilerOrta Doğu Teknik Üniversitesi

    Uluslararası İlişkiler Ana Bilim Dalı

    YRD. DOÇ. DR. IŞIL ANIL

  2. Afet sonrası kalıcı konutlarda katılımcı yaklaşım

    Participatory approach in permanent housing after disaster

    CAFER MUSTAFA ÇETİNDAŞ

    Yüksek Lisans

    Türkçe

    Türkçe

    2019

    MimarlıkYıldız Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    DOÇ. DR. MUZAFFER TOLGA AKBULUT

  3. Afet bölgesi yeniden inşa projelerinde sürdürülebilir mimarlık

    Sustainable architecture in disaster area reconstruction projects

    MEHMET ALİ İÇYEROĞLU

    Yüksek Lisans

    Türkçe

    Türkçe

    2025

    MimarlıkMunzur Üniversitesi

    Mühendislik Yönetimi Ana Bilim Dalı

    PROF. DR. KENAN PEKER

  4. Management of post disaster reconstruction projects: A comparative analysis with conventional projects

    Afet sonrası yeniden yapım projelerinin yönetimi: Geleneksel yapım projeleri ile karşılaştırmalı bir analiz

    OMIMAH MOHAMMED SAEED AL-SAADI

    Yüksek Lisans

    İngilizce

    İngilizce

    2017

    Mimarlıkİstanbul Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    DOÇ. DR. EMRAH ACAR

  5. Developing a framework for target cost in post-disaster housing by minimizing time and optimizing cost using 3D model

    Afet sonrası konutlarında hedef maliyet için bir çerçeve geliştirme: Zamanın minimize edilmesi ve maliyetin 3 boyutlu model kullanılarak optimize edilmesi

    ZAFER ÜZMEZ

    Yüksek Lisans

    İngilizce

    İngilizce

    2024

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    DOÇ. DR. ONUR BEHZAT TOKDEMİR