Design of a hybrid multi-criteria decision-making (MCDM) andstochastic cash-flow frameworkfor project selection byconstruction contractors
İnşaat müteahhitlerinin proje seçimi için hibrit çok kriterli karar verme (ÇKKV) ve stokastik nakit akışı çerçevesinin tasarlanması
- Tez No: 1025692
- Danışmanlar: DR. ÖĞR. ÜYESİ TUBA DUMLU
- Tez Türü: Doktora
- Konular: Ekonomi, İnşaat Mühendisliği, İşletme, Economics, Civil Engineering, Business Administration
- Anahtar Kelimeler: Finansal yönetim, Karar verme, Monte Carlo Yöntemi, Nakit akışı, Risk yönetimi, Çok kriterli karar verme, İnşaat endüstrisi, İnşaat yönetimi, Financial management, Decision making, Monte Carlo Method, Cash flow, Risk management, Multi criteria decision making, Construction industry, Construction management
- Yıl: 2026
- Dil: İngilizce
- Üniversite: Yeditepe Üniversitesi
- Enstitü: Sosyal Bilimler Enstitüsü
- Ana Bilim Dalı: Finansal İktisat Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: Belirtilmemiş.
Özet
İnşaat sektörü, küresel ekonomik gelire önemli bir katkı sağlamakla birlikte, sürekli nakit akışı sorunları ve yüksek müteahhit iflas oranlarıyla karşı karşıyadır. Proje seçim kararı (bid/no-bid kararı), özellikle deniz ve liman altyapısı gibi sermaye-yoğun uluslararası piyasalarda, müteahhidin uzun vadede ayakta kalıp kalamayacağını çoğu zaman belirler. Geleneksel proje seçim literatürü çoğunlukla projenin kendi cazibesini ölçen çok kriterli karar verme (ÇKKV) tekniklerine dayanır; nakit akışı performansını ise müteahhidin üstlendiği gerçek bir likidite riski olarak değil, tek bir sabit ağırlık olarak ele alır. Bu tez ise nakit akışı performansını çalışmanın merkezine yerleştirir ve uluslararası deniz ve liman inşaat sektöründe müteahhit tarafının bid/no-bid kararlarını desteklemek üzere uzman görüşünü olasılıksal finansal modellemeyle birleştiren iki katmanlı Hibrit Nakit Akışı Temelli ÇKKV Çerçevesini (Hybrid Cash-Flow-Anchored MCDM Framework) geliştirir. Teorik olarak, tez uzman ÇKKV değerlendirmesini stokastik bir nakit akışı modeliyle birleştiren iki katmanlı bir çerçeve sunar ve müteahhit seviyesinde iki ölçüt olan Contractor Cash-Flow at Risk (CCFaR) ile bileşik Contractor Financial Viability Score (CFVS) metriklerini ekler. Metodolojik olarak, uzman kriter ağırlıklandırmasını Monte Carlo nakit akışı simülasyonuyla birleştirir ve sonuçları kararlılık, sağlamlık ve gerçekleşen sonuçlarla uyum açısından sınar. Pratik olarak, bir firmaya göre kalibre edildiğinde kullanıma hazır bir bid/no-bid aracı olarak Hybrid Decision Matrix ile Margin Haircut Decision Protocol (MHDP) eşiğini sunar. Ampirik olarak, çerçeve portföyün tek gerçekleşen zararını teklif aşamasında işaretlemiştir; oysa projenin beyan edilen marjı basit bir marj kontrolünden geçecek düzeydeydi. Bu katkılar birlikte, bid/no-bid kararını projenin cazibesi, likidite riski ve marj gerçekçiliğini birlikte değerlendiren bir karar olarak yeniden çerçeveler.
Özet (Çeviri)
The construction industry is a major contributor to global economic output, yet it is highly exposed to cash-flow stress and contractor insolvency. The bid/no-bid decision often determines whether a contractor survives in the long run, especially in capital-intensive international markets such as marine and port infrastructure. Most project selection studies use multi-criteria decision-making (MCDM) techniques that score a project's intrinsic attractiveness, but they treat cash-flow performance as a single static weight rather than a real liquidity risk the contractor carries. This thesis instead places cash-flow performance at the center. It develops a two-layer Hybrid Cash-Flow-Anchored MCDM Framework that combines expert judgment with probabilistic financial modeling to support contractor-side bid/no-bid decisions in the international marine and port construction sector. Theoretically, the thesis offers a two-layer framework that joins expert MCDM evaluation with a stochastic cash-flow model and adds two contractor-level measures, the Contractor Cash-Flow at Risk (CCFaR) and the composite Contractor Financial Viability Score (CFVS). Methodologically, it combines expert criterion weighting with Monte Carlo cash-flow simulation and tests the results for stability, robustness and agreement with realized outcomes. Practically, it provides the Hybrid Decision Matrix and the Margin Haircut Decision Protocol (MHDP) as a bid/no-bid tool ready to use once calibrated to a firm. Empirically, the framework flagged the portfolio's only realized loss at bid stage, even though its declared margin would have passed a simple margin check. Together these reframe the bid/no-bid decision as one that must weigh project attractiveness, liquidity risk and margin realism.
Benzer Tezler
- Kan tedarik zinciri ağ tasarımı ve süreç yönetiminde çok aşamalı stokastik programlama modelleri ve çözüm yaklaşımı
Multi-stage stochastic programming models and solution approach for blood supply chain network design and management
GÜL İMAMOĞLU
Doktora
Türkçe
2024
Endüstri ve Endüstri Mühendisliğiİstanbul Teknik ÜniversitesiEndüstri Mühendisliği Ana Bilim Dalı
PROF. DR. Y. İLKER TOPÇU
PROF. DR. NEZİR AYDIN
- Bir otomotiv fabrikasında baca gazı arıtım ekipmanının crıtıc ve multımoora metodları ile belirlenmesi
Selection of flue gas treatment equipment in an automotive factory using the critic and multimoora methods
SERKAN ERDOĞAN
Yüksek Lisans
Türkçe
2025
Endüstri ve Endüstri MühendisliğiSakarya ÜniversitesiEndüstri Mühendisliği Ana Bilim Dalı
DOÇ. DR. ALPARSLAN SERHAT DEMİR
- İzmir'de bazı yolların kapatılarak yaya bölgeleri oluşturma da kent peyzajını geliştirme açısından yeniden planlanması üzerinde araştırmalar
Başlık çevirisi yok
BAHAR TÜRKYILMAZ
Yüksek Lisans
Türkçe
1985
Şehircilik ve Bölge PlanlamaEge ÜniversitesiŞehir ve Bölge Planlama Ana Bilim Dalı
- Ağızlık açma mekanizmalarının tasarımı
Başlık çevirisi yok
RECEP EREN
Yüksek Lisans
Türkçe
1987
Tekstil ve Tekstil MühendisliğiUludağ ÜniversitesiTekstil Mühendisliği Ana Bilim Dalı
DOÇ. DR. HALİL R. ALPAY
- Sonbahar sera yetiştiriciliğine uygun hıyar çeşit seçimi
Selecting a cucumber variety suitable for glasshouse production in Autumn
MESUT OKTAY