Güneş enerjisi santrali projelerinde proje yönetimi kriterlerinin hiyerarşik BWM-TOPSIS yöntemiyle ağırlıklandırılması

Weighting project management criteria for solar power plant projects using hierarchical BWM-TOPSIS method

  1. Tez No: 1029226
  2. Yazar: BURAK AKDEMİR
  3. Danışmanlar: DOÇ. DR. ONUR BEHZAT TOKDEMİR
  4. Tez Türü: Yüksek Lisans
  5. Konular: Enerji, İnşaat Mühendisliği, Mühendislik Bilimleri, Energy, Civil Engineering, Engineering Sciences
  6. Anahtar Kelimeler: Güneş Enerjisi Santrali, Proje Yönetimi, Hiyerarşik Best-Worst Yöntemi, TOPSIS, Çok Kriterli Karar Verme, Solar Power Plant, Project Management, Hierarchical Best-Worst Method, TOPSIS, Multi-Criteria Decision Making
  7. Yıl: 2026
  8. Dil: Türkçe
  9. Üniversite: İstanbul Teknik Üniversitesi
  10. Enstitü: Lisansüstü Eğitim Enstitüsü
  11. Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Yapı İşletmesi Bilim Dalı
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Türkiye, son yıllarda güneş enerjisi kurulu gücünü hızla artırmış ve 2035 vizyonu çerçevesinde yenilenebilir enerjide iddialı hedefler benimsemiştir. Bu hızlı büyüme, arazi tipi güneş enerjisi santrali (GES) projelerinin planlama, tedarik, kurulum ve işlet-me aşamalarında çok boyutlu ve sistematik karar destek mekanizmalarına duyulan ih-tiyacı belirginleştirmektedir. Ne var ki mevcut literatür ağırlıklı olarak yer seçimi ve teknik-ekonomik fizibiliteye odaklanmakta; izin süreçleri, tedarik zinciri kırılganlıkları, paydaş ilişkileri ve şebeke kapasite tahsisi gibi proje yönetimi ile yapı işletmesi (Con-struction Management - CM) boyutunu büyük ölçüde dışarıda bırakmaktadır. Oysa Türkiye bağlamında projelerin başarısını çoğu zaman finansal parametrelerden çok bu yönetsel ve düzenleyici unsurlar belirlemektedir. Bu tezin temel amacı, söz konusu boşluğu Türkiye GES sektörüne özgü bir kriter mimarisi ve gerçek proje verisiyle beslenen bütünleşik bir karar destek modeli geliştirerek doldurmaktır. Çalışma bu amaç doğrultusunda üç temel soru etrafında kurgulanmıştır: GES projele-rinin değerlendirilmesinde hangi proje yönetimi kriterleri belirleyicidir, bu kriterler sektör tarafından nasıl önceliklendirilmektedir ve önerilen model gerçek projeler üzerinde kararlı ve uygulanabilir sonuçlar üretmekte midir? Bu sorulara yanıt aramak üzere Hiyerarşik En İyi-En Kötü Yöntemi (H-BWM) ile TOPSIS tekniği bütünleşik biçimde kullanılmıştır. Dört ana grup (Teknik/İnşaat, Proje Yönetimi/Yapı İşletmesi, Ekonomik/Finansal ile Çevresel-Yasal-Mevzuat) altında toplanan ve on dokuz alt kriterden oluşan set, alanda altı ila yirmi yılı aşan deneyime sahip on beş uzmanın görüşleri temel alınarak ağırlıklandırılmıştır. Uzman değerlendirmeleri, bu tezde geliştirilen ve görüş tutarlılığı yüksek uzmanlara daha fazla ağırlık veren özgün bir birleştirme yaklaşımıyla bir araya getirilmiş; elde edilen ağırlıklar Türkiye'nin farklı bölgelerindeki on gerçek GES projesine TOPSIS yoluyla uygulanarak projeler bütüncül biçimde sıralanmıştır. Çalışmanın en belirgin bulgusu, GES proje değerlendirmesinde finansal göstergelerin tek başına yeterli olmadığıdır. İzin süreçlerinin zorluğu ve şebeke altyapısına ilişkin riskler, geri dönüş süresi ve yatırım maliyeti gibi finansal kriterlerle yarışan bir belirley-iciliğe ulaşmış; bu kalemler projeleri birbirinden ayıran kritik darboğazlar olarak öne çıkmıştır. Sıralama sonuçları ayrıca, büyük ölçekli projelerin her zaman avantajlı olma-dığını; güçlü finansal temellere sahip bazı projelerin yapı işletmesi ve düzenleyici za-yıflıklar nedeniyle gerileyebildiğini ortaya koymuştur. Modelin farklı ağırlıklandırma ve birleştirme senaryoları altında sınanması, elde edilen sıralamanın büyük ölçüde kararlı kaldığını ve yöntemin gerçek saha koşullarında güvenilir biçimde uygulanabild-iğini göstermiştir. Tezin katkıları üç düzeyde toplanabilir. Kuramsal düzeyde çalışma, önceki literatürde büyük ölçüde göz ardı edilen proje yönetimi/yapı işletmesi boyutunu GES değer-lendirmesinde bağımsız bir eksen olarak konumlandırmakta ve problemi salt finansal bir hesaplama olmaktan çıkararak gerçek anlamda çok boyutlu bir karar problemi olarak yeniden çerçevelemektedir. Yöntemsel düzeyde, H-BWM ile TOPSIS ente-grasyonunu şeffaf ve yinelenebilir bir çerçevede işlevselleştirmekte; uzman tutarlılığını gözeten birleştirme yaklaşımıyla grup kararının güvenilirliğini ve izlenebilirliğini güçlendirmektedir. Uygulama düzeyinde ise yatırımcılar, EPC firmaları, kamu otoriteleri ve finans kuruluşları için Türkiye sahasına özgü, ölçeklenebilir ve karar ver-iciyi yöntemin teknik ayrıntılarından bağımsız kılan pratik bir araç ortaya koymaktadır. Bu pratik hedefi somutlaştırmak üzere tez, geliştirilen metodolojinin bir yazılım aracı olarak operasyonelleştirilmesine yönelik SolarApp adlı kavramsal bir karar destek sis-temi önermektedir (EK A). Böylece çalışma, yalnızca akademik bir değerlendirme çerçevesi sunmakla kalmamakta; sektör paydaşlarının doğrudan kullanabileceği, uygu-lamaya dönük bir yol haritası da ortaya koymaktadır. Bütün olarak tez, Türkiye GES projelerinin seçim ve önceliklendirme sürecini teknik, yönetimsel, ekonomik ve düzen-leyici boyutları birlikte gözeten bütüncül bir karar modeline kavuşturmayı hedefle-mektedir.

Özet (Çeviri)

Türkiye reached an installed solar power capacity of nearly 25 GW by 2025 and has adopted an ambitious combined solar and wind target of 120 GW by 2035, a goal that requires roughly 7–8 GW of new solar capacity to be added to the grid each year. This rapid expansion sharply increases the need for multidimensional and systematic deci-sion support mechanisms across the planning, procurement, construction, and opera-tion stages of ground-mounted solar power plant (SPP) projects. The existing litera-ture, however, concentrates predominantly on site selection and techno-economic fea-sibility, while the project management and construction management (CM) dimension — permitting processes, supply chain vulnerabilities, stakeholder relations, and grid capacity allocation risk — remains largely fragmented or absent. In the Turkish con-text, project success is frequently determined less by financial parameters than by these managerial and regulatory factors. The primary aim of this thesis is to bridge that gap by developing a criterion architecture specific to the Turkish SPP sector together with an integrated decision support model fed by real project data. A review of MCDM applications in the solar field confirms that the project manage-ment and CM dimension has remained peripheral to evaluation frameworks. The pre-sent thesis instead positions it as an independent main axis (Group B) and, in parallel, isolates regulatory risks specific to Türkiye — most notably grid capacity allocation risk (D5) — thereby reframing SPP evaluation as a genuinely multidimensional prob-lem rather than a primarily financial one. The study is organized around three research questions: which project management criteria are decisive in evaluating Turkish SPP projects (RQ-1), how the sector prioritizes these criteria (RQ-2), and whether the pro-posed model yields stable and applicable results on real projects (RQ-3). To answer these questions, the Hierarchical Best-Worst Method (H-BWM) and the TOPSIS technique are used in an integrated manner. The criterion set comprises four main groups — Technical/Construction (A), Project Management/CM (B), Econom-ic/Financial (C), and Environmental, Legal and Regulatory (D) — and 19 sub-criteria, weighted on the basis of judgments from fifteen experts with six to over twenty years of sector experience. Each expert performed five separate BWM comparisons, one for the main group and one for each sub-criterion group, yielding 75 linear programming models in total; main group weights were then multiplied with sub-criterion weights to obtain global weights for all 19 criteria. Expert judgments were combined through a CR⁻¹-weighted geometric mean approach developed in this thesis as an original meth-odological contribution that builds on, yet reduces the computational burden of, the Bayesian BWM framework; by granting higher weight to more internally consistent experts, it automatically limits the influence of less consistent panelists on the group decision. The consistency threshold was set conservatively at CR ≤ 0.10, calibrated against the acceptable ranges in the threshold tables of Liang et al. (2020). The result-ing global weights were transferred without further transformation into TOPSIS, where vector normalization, the separation of benefit- and cost-oriented criteria, and the relative closeness coefficient (Cᵢ) produced a holistic ranking of ten real SPP projects. The most salient finding is that financial indicators alone are insufficient to evaluate SPP projects. The H-BWM analysis produced main group weights of 32.30% (C), 24.81% (A), 23.56% (B), and 19.33% (D); the narrow band of roughly four percent-age points separating the top three groups shows that no single dimension dominates project decisions in Türkiye. At the sub-criterion level, the three highest global weights belong to C3 Payback Period (11.48%), B1 Permit Process Complexity (8.84%), and C1 CAPEX (8.84%), followed by C4 Financing/FX Risk (8.01%) and A4 Grid Dis-tance (7.80%). The prominence of B1 — a purely bureaucratic factor — confirms that permitting difficulty and grid infrastructure risk reach a decisiveness rivalling that of payback period and investment cost. Applied to ten actual projects across different regions, TOPSIS yielded the ranking PRJ-003 Kayseri (Cᵢ = 0.7633) > PRJ-010 Gaziantep > PRJ-004 K.Maraş > PRJ-009 Denizli > PRJ-006 Elazığ > PRJ-008 Şanlıurfa > PRJ-005 Konya > PRJ-001 Adana > PRJ-002 Balıkesir > PRJ-007 Osmaniye (0.4336). A closer reading exposes three structural patterns. The scale–performance paradox is evident in the contrast between top-ranked Kayseri and last-ranked Osmaniye, confirming that larger capacity does not guarantee superior multi-criteria standing. PRJ-006 (Elazığ) shows how strong finan-cial fundamentals can be offset by construction management weaknesses, holding an otherwise attractive project to mid-ranking. The lower-ranked Balıkesir and Adana illustrate how a heavy bureaucratic and permitting burden depresses overall perfor-mance. Together, these cases identify permit process complexity (B1) and grid capacity allocation risk (D5) as the two critical bottlenecks that differentiate Turkish SPP pro-jects. Model robustness was tested through a sensitivity analysis spanning 21 scenarios across three perturbation strategies — expert aggregation, main group weights, and top sub-criterion weights. Sixteen of the twenty-one scenarios satisfied the Spearman ρ ≥ 0.95 stability threshold, the lowest value being ρ = 0.8788; this 76.2% stability rate indicates that the ranking is robust under most perturbation conditions and that the model is methodologically sound. These results answer the research questions directly: a four-group, nineteen-criterion architecture in which project management and Türkiye-specific regulatory risks stand as independent axes captures the evaluation problem (RQ-1); the sector prioritizes payback period, permit complexity, and CAPEX without any single group dominating (RQ-2); and the model produces a stable, interpretable ranking on real projects (RQ-3). The thesis offers three principal contributions. Theoretically, it introduces the project management/CM dimension as an independent axis in MCDM-based SPP evaluation, an aspect largely overlooked in prior literature. Methodologically, it operationalizes the H-BWM–TOPSIS integration through a transparent and replicable CR⁻¹-weighted aggregation scheme that strengthens the reliability and traceability of the group deci-sion. Practically, it provides investors, EPC firms, public authorities, and financial in-stitutions with a scalable, Türkiye-specific tool that prioritizes projects across multiple dimensions simultaneously. Each group draws a distinct implication: investors must treat the combined weight of permit complexity and grid distance (16.64%) as an ex-plicit feasibility line item; EPC contractors must price supply chain risk (B4, 4.55%) into turnkey contracts; public authorities, given the weight of B1 (8.84%) and grid ca-pacity allocation risk (D5, 7.72%), should standardize permitting and improve grid-connection predictability; and financial institutions should extend bankability assess-ment beyond payback and debt-service metrics to incorporate financing/FX risk (C4, 8.01%). To make this practical aim concrete, the thesis proposes SolarApp, a conceptual deci-sion support system (Appendix A) that operationalizes the methodology into a soft-ware tool, enabling practitioners to apply the framework without expertise in BWM or TOPSIS computations. The study is bounded by a sample of ten projects, a static weighting scheme, a country-specific regulatory context, and crisp (non-fuzzy) inputs; future work may extend the dataset to 50–100 projects, integrate fuzzy or interval-valued BWM variants to capture expert uncertainty, conduct comparative cross-country applications, and adapt the framework to other renewable types such as wind, hybrid solar–wind, geothermal, and small hydroelectric projects. As a whole, the thesis equips the selection and prioritization of Turkish SPP projects with a holistic decision model that weighs technical, managerial, economic, and regulatory dimensions together — offering not only an academic evaluation framework but also an applicable roadmap for sector stakeholders.

Benzer Tezler

  1. Contract and claim management in solar power plant (SPP)projects

    Güneş enerji santrali (GES) projelerinde sözleşme ve haktalebi yönetimi

    BURAK ERÇELEN

    Yüksek Lisans

    İngilizce

    İngilizce

    2019

    İstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  2. Risk management approach and risk analysis in solar thermal energy projects

    Termal güneş enerji projelerinde risk yönetimi yaklaşımı ve risk analizi

    YELİZ ŞİMŞEK

    Yüksek Lisans

    İngilizce

    İngilizce

    2014

    İstanbul Teknik Üniversitesi

    Enerji Bilimi ve Teknolojileri Ana Bilim Dalı

    Yükleniyor...

  3. Kamu sektöründe enerji performans sözleşmelerinin uygulama zorlukları ve çözüm önerileri: Türkiye örneği

    Implementation challenges and solution proposals for energy performance contracts in the public sector: The case of Turkey

    SERCAN KOLİK

    Yüksek Lisans

    Türkçe

    Türkçe

    2025

    Yıldız Teknik Üniversitesi

    Enerji Teknolojileri Ana Bilim Dalı

    Yükleniyor...

  4. Enerji yoğun bir tesiste enerji verimliliği proje tasarımı ve uygulama çalışması

    Energy efficiency project design and application study of an energy-intensive facility

    MURAT ÖZKÖK

    Yüksek Lisans

    Türkçe

    Türkçe

    2010

    Gazi Üniversitesi

    Makine Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  5. Landsat uydusu aracılığı ile elde edilen görüntülerin sınıflandırılmaları ve bunlara ilişkin bilgisayar programlarının hazırlanması

    Başlık çevirisi yok

    G. FERZAN KÜÇÜKA

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Bilgisayar Bilimleri ve Mühendisliği Ana Bilim Dalı

    Yükleniyor...