Geri Dön

Kanepe alt sunta montaj hattının otomasyonlaştırılması ile üretimin arttırılması

Increasing of production by automation of sofa bottom fiberboard mounting line

  1. Tez No: 197273
  2. Yazar: ZİYA MURAT ÖZTÜRK
  3. Danışmanlar: Y.DOÇ.DR. EYYUP GERÇEKÇİOĞLU
  4. Tez Türü: Yüksek Lisans
  5. Konular: Makine Mühendisliği, Mechanical Engineering
  6. Anahtar Kelimeler: Montaj, otomasyon, mobilya, Mounting, automation, furniture
  7. Yıl: 2005
  8. Dil: Türkçe
  9. Üniversite: Erciyes Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Makine Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

IIIKANEPE ALT SUNTA MONTAJ HATTININ OTOMASYONLAŞTIRILMASIİLE ÜRETİMİN ARTTIRILMASIZiya Murat ÖZTÜRKErciyes Üniversitesi, Fen Bilimleri EnstitüsüYüksek Lisans Tezi, Ağustos 2005Tez Danışmanı: Yrd. Doç. Dr. Eyyup GERÇEKCİOĞLUÖZETBir montaj işleminde, işlemler otomasyona uyarlanarak işçilikten tasarruf amaçlandı.Montaj otomasyonunda her işlem kendine ait iş istasyonunda işlem görmektedir. Bunagöre iş istasyonları; tutkallama, sunta koyma, çivi çakma ve döndürme istasyonlarındanmeydana gelmektedir. İş istasyonları arasındaki iletim konveyörlerle sağlanmaktadır.Konveyör hızı bu işlemden sonra ?döşeme prosesine? göre hattın dengelenmesi için halihazırdaki mevcut sisteme uyarlanarak yapılmıştır. Konveyörler sürekli çalışmayıp işistasyonlarının PLC prensibine uygun şekilde dur-kalk hareketleri ile çalıştırılmıştır.Konveyör bandı olarak şartlara uygunluğuna göre 2 M8 UO-V-U2 seçilmiştir. Suntabesleme için vidalı millerle kontrol edilen bir platform kullanılmıştır. Sunta koymaişleminde pozitif basıncı vakuma çevirebilen vakum jeneratörü kullanılmıştır. Halihazırdaki çivi tabancası çivi doldurmaya uygun olmadığından sistemde tel zımbayauygun modifiye yapılarak Stanley ATRO Vulcano 100/50 tabanca kullanılmıştır. Sistemautocad ve pro engineer programlarında projelendirilerek pro engineer de similasyonugerçekleştirilmiştir.Böylece, mevcut sisteme göre eleman sayısı ve proses süresi bakımından avantajsağlanmıştır.

Özet (Çeviri)

IVINCREASING OF PRODUCTION BY AUTOMATION OF SOFA BOTTOMFIBERBOARD MOUNTING LINEZiya Murat ÖZTÜRKErciyes University, Graduate School of Natural and Applied SciencesMs. Thesis, August 2005Thesis Supervisor: Assoc. Prof. Eyyup GERÇEKCİOĞLUABSTRACTIn a mounting process, a careful use of work power was aimed by adapting the stepsinto automation.In mounting automation, each procedure is operated in a workstation that belongs toitself. So, workstations consist of glueing, fiberboard placing, nail driving and rotationstations. The conveyance among workstations is provided with conveyors. Theconveyor speed has been regulated by adapting it into the existing system for thestabilization of line according to the ?furnish process? after this procedure. Theconveyors did not operate continuously, but they were operated by stop-rise movementsthat are suitable with the PLC principle of workstations. As conveyor band, 2 M8 UO-V-U2 has been chosen according to the suitability of conditions. A platform has beenused which is controlled by screwed shafts for fiberboard feeding. In fiberboard placingprocess, a vacuum generator has been used which can transform the positive pressureinto vacuum. As the existing nail gun isn?t suitable for filling up nail, a Stanley ATROVulcano 100/50 gun has been used by modifying it suitably with the wire punch, in thesystem. The system has been projected in autocad and pro engineer programs andsimulated in pro engineer program.Conclusion, an advantage has been provided from the point of view of staff amount andprocess period in comparison to the existing system.

Benzer Tezler

  1. Mobilyada test teknikleri ve kalite kontrol üzerine araştırmalar

    Başlık çevirisi yok

    ARİF GÜRAY

    Doktora

    Türkçe

    Türkçe

    1988

    Hacettepe Üniversitesi

    Ağaç İşleri Endüstri Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  2. Yeni kurulan bir işletmede metod geliştirme ve ergonomik tasarım

    Method development and ergonomical design in a newly constructed firm

    CEMAL BEDESTENCİ

    Yüksek Lisans

    Türkçe

    Türkçe

    1993

    İstanbul Teknik Üniversitesi

    Yükleniyor...

  3. Sanayi işletmelerinde ana üretim planlama ve bütünleşik üretim planlama uygulaması

    An application of master production planning and aggregate production planning on industrial firms

    MEHMET SELAMİ YILDIZ

    Doktora

    Türkçe

    Türkçe

    2000

    Atatürk Üniversitesi

    İşletme Ana Bilim Dalı

    Yükleniyor...

  4. Sarız (Kayseri) düz dokumaları

    Smooth weaving ground cloth of Sarız (Kayseri) regions

    ZAHİDE ŞAHİN

    Yüksek Lisans

    Türkçe

    Türkçe

    2002

    Erciyes Üniversitesi

    Sanat Tarihi Ana Bilim Dalı

    Yükleniyor...