Bir demiryolu tünelinin tahkimat analizleri

Support snslysis for a railway tunnel

  1. Tez No: 276304
  2. Yazar: KAYGUSUZ ÜNLÜ
  3. Danışmanlar: DOÇ. DR. İHSAN ÖZKAN
  4. Tez Türü: Yüksek Lisans
  5. Konular: Maden Mühendisliği ve Madencilik, Mining Engineering and Mining
  6. Anahtar Kelimeler: Tünel, kaya kütle sınıflaması, püskürtme beton, kaya saplaması, sayısal çözümleme, Tunnel, rock mass classification, blasting concrete, rock pinning, numerical analysis
  7. Yıl: 2010
  8. Dil: Türkçe
  9. Üniversite: Selçuk Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Maden Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 158

Özet

Bu çalışmada Konya-Polatlı-Ankara demiryolu güzergahı üzerinde konumlanan Bozdağ'da açılan tünele ait tahkimat analizleri yapılmıştır. Tahkimat analizlerinde sahada gerçekleştirilen beş sondaj verisinden elde edilen kaya kütle sınıflama sonuçları kullanılmıştır. Tünel genişliği 13 m olan açıklıkta tünel ekseni, jeoteknik açıdan 12 farklı bölgeye ayrılmış ve her bölge için kaya kütle malzeme özellikleri (?_c,?_cm,E_i,E_m,m,s,a) belirlenmiştir. Sınıflama sonuçlarına bağlı yeni Avusturya tünelcilik (NATM) yaklaşımı kullanılarak tahkimat türleri ve boyutları seçilmiştir. Tünelde kaya saplamaları, beton, çelik bağ, çelik tel hasır ve jeotekstil membran tahkimat üniteleri olarak kullanılmıştır. Tahkimat ünitelerine ait mekanik özellikler ve kaya kütle özelliklerine bağlı olarak PHASE2 programı yardımıyla sayısal çözümlemeler gerçekleştirilmiştir. Sayısal analizler neticesinde tünel kesitinde en büyük ikincil gerilmelerin ve yerdeğişimlerinin tünel tabanında olduğu görülmüştür. En büyük yerdeğişimlerinin oluştuğu tünel tavanı, yan cidarı ve tabanı sırasıyla Km 177+100-177+380 (ui=8.1 mm), Km 177+100-177+380 (ui=7.65 mm) ve Km 175+360-175+390 (ui=13.8 mm) `dır. PHASE2 çıktılarına bağlı olarak önce her iki kesite ait ortalama yerdeğişimler, sonra B1, B2 ve B3 NATM sınıflarına ait ortalama yerdeğişimler sırası ile 1.1, 2.84 ve 5.2 mm olarak hesaplanmıştır. Sahada gerçekleştirilen ölçümlerden ise bu NATM sınıflarında ölçülen yerdeğişimlerinin sırasıyla 2.94, 6.62 ve 7.23 mm olduğu belirlenmiştir. PHASE2 çıktıları ile gerçek ölçüm sonuçları arasında güçlü bir istatistiksel ilişki olduğu tespit edilmiştir.

Özet (Çeviri)

In this study, fortification anaysis of a tunnel in Bozdağ, which is an area on Konya ? Polatlı ? Ankara railway route, has been done. In related fortification analysis, rock mass classification results, that is provided from 5 drilling datas on field, has been utilized. The tunnel with 13 m axis width, separated into 12 different areas and rock mass material characteristics (?c,?cm, Ei,Em, m, s, a) was defined for each area. New fortification types and dimensions has been set by using Austrian Tunneling Aproach according to classification results. Rock pinnings, concrete, steel links and mats and jeotextile membrane are utilized as fortification units. Numerical analysis has been done with the support of PHASE2 Program and according to rock mass and mechanical characteristics of fortification units. By the end of numerical analysis it is observed that the second largest tension and place exchagings on tunnel section was on tunnel floor. The tunnel ceiling, which had the largest place exchangings, side hull and floor dimensions is in order; Km 177+100-177+380 (ui=8.1 mm), Km 177+100-177+380 (ui=7.65 mm) ve Km 175+360-175+390 (ui=13.8 mm). At first, average place exchangings of both tunnel sections and then other average place exchangings ,which belong to B1, B2 and B3 NATM types, has been calculated as 1.1, 2.84 ve 5.2 mm according to PHASE2 results. It is also determined from measurements, that were done on field, the dimensions of place exchangings in NATM types are 2.94, 6.62 ve 7.23 mm. In conclusion, it is confirmed that, there is a strong statistical relation between PHASE2 and fieldwork results.

Benzer Tezler

  1. Stability analysis of a coupled structure: A railway tunnel and a road cut slope

    Bir demiryolu tünelinin ve bir yol şevinin stabilitesinin ikili analizi

    BURCU ÜNLÜTÜRK

    Yüksek Lisans

    İngilizce

    İngilizce

    2018

    Maden Mühendisliği ve MadencilikOrta Doğu Teknik Üniversitesi

    Maden Mühendisliği Ana Bilim Dalı

    DOÇ. DR. HASAN AYDIN BİLGİN

  2. Rehabilitation of Malatya-Narlı No: 7 railroad tunnel

    Malatya-Narlı demiryolu tünelinin ıslah etme çalışmaları

    BARIŞ DİVLELİ

    Yüksek Lisans

    İngilizce

    İngilizce

    2004

    Maden Mühendisliği ve MadencilikOrta Doğu Teknik Üniversitesi

    Maden Mühendisliği Ana Bilim Dalı

    PROF. DR. ERDAL ÜNAL

  3. On the trail of west – east signalling interoperability:A novel proposal for an STM and an interface for ETCS onboard operating on class b trackside signalling systems

    Batı – doğu arası karşılıklı işletilebilirliğin izinde: ETCS araç üstü sistemlerin sınıf b hat yanı sinyal sistemleri üzerinde çalışması için yeni bir STM ve arayüz önerisi

    ÇAĞLA KIVILCIM ÇİFTCİOĞLU

    Yüksek Lisans

    İngilizce

    İngilizce

    2024

    Elektrik ve Elektronik Mühendisliğiİstanbul Teknik Üniversitesi

    Raylı Sistemler Mühendisliği Ana Bilim Dalı

    PROF. DR. MEHMET TURAN SÖYLEMEZ

  4. Yersel lazer tarama kullanarak dairesel kesitli tüneller için ölçüm planlaması: Palu demiryolu tüneli örneği

    Measurement planning for circular section tunnels using terrestrial laser scanning: Palu railway tunnel example

    AYSEL SADAK

    Yüksek Lisans

    Türkçe

    Türkçe

    2022

    Jeodezi ve FotogrametriYıldız Teknik Üniversitesi

    Harita Mühendisliği Ana Bilim Dalı

    PROF. DR. BÜLENT BAYRAM

  5. Geological and geotechnical investigation of Antalya-Burdur railway T12 tunnel

    Antalya-Burdur demiryolu T12 tünelinin jeolojik ve jeoteknik incelenmesi

    ECE ESER

    Yüksek Lisans

    Türkçe

    Türkçe

    2022

    Jeoloji MühendisliğiKonya Teknik Üniversitesi

    Jeoloji Mühendisliği Ana Bilim Dalı

    PROF. DR. ALİ RIZA SÖĞÜT