Ankara-İstanbul Hızlı Tren Projesi 26 nolu tünelin TBM kazı performansının QTBM metodu ile tahmini
Performance estimation of TBM excavation for tunnel no 26 by using QTBM method in Ankara-Istanbul High Speed Railway Project
- Tez No: 329330
- Danışmanlar: YRD. DOÇ. MUSTAFA KORKANÇ
- Tez Türü: Yüksek Lisans
- Konular: Jeoloji Mühendisliği, Geological Engineering
- Anahtar Kelimeler: Belirtilmemiş.
- Yıl: 2012
- Dil: Türkçe
- Üniversite: Niğde Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: Jeoloji Mühendisliği Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: 120
Özet
Ankara-İstanbul Yüksek Hızlı Tren Projesi, oldukça engebeli bir topografyadan geçmektedir. Hızlı demiryolu projelerinde sınırlı eğim ve kurp töleransları nedeni ile güzergah çalışmalarında tünel çözümlerine başvurulmaktadır. Bilecik ile Bozüyük istasyonları arasında kalan 26'nolu tünel, grafit şistler içerisinde NATM (Yeni Avusturya Tünel Açma Yöntemi) ile Eylül - Ekim 2009 tarihinde giriş portalından açılmaya başlanmıştır. Bu kısımda 298 metre toplam ilerleme yapılmış olup ortalama ilerleme 2,0 metre/gün'dür. Tünelin açıldığı kesimde yerel kaya koşullarının benzer davranışlar göstermesi nedeniyle bu ilerleme hızının değişmeyeceği öngörülmüştür. Aynı hızla ve aynı yöntemle açılması planlanan 6100 metre uzunluğundaki 26'nolu tünelin tamamlanması için gereken süre, 1525 gün olarak hesaplanmıştır. Bu süreye tünelin kemer betonunun imalatı dahil edilmemiş olup, eklendiğinde bu sürenin 200 gün kadar daha artacağı belirlenmiştir. Böylece projenin öngörülen sürede bitmeyeceğinin anlaşılması yanında, tünel güzergahının jeolojik-jeoteknik özellikleri nedeniyle mevcut tünelin NATM ile açılması durumunda, tünel imalat maliyetinin de öngörülenden daha fazla olacağı anlaşılmıştır. Tünelin imalat süresinin ve maliyetinin planlanandan fazla olması nedeniyle, tünel kazı sisteminin tam dairesel kesitli tünel açma makinesi (TBM) ile açılmasının daha uygun olacağına karar verilmiştir.Bu çalışmada, Tünel inşasını yapacak olan S627 ürün kodlu TBM'in 26'nolu tünel profilini oluşturan yerel kaya koşullarından faydalanılarak TBM kazı performansının önceden tahmin edilmesi amaçlanmıştır. Bu amaçla QTBM yöntemi kullanılmıştır. Yapılan hesaplamalar sonucunda ilerleme hızının 8,35 m/saat, anlık ilerleme hızının ise 0,75 m/saat olacağı hesaplanmıştır. Böylelikle ideal koşullarda tünel imalatının 1 yıl içerisinde tamamlanması öngörülmüştür.
Özet (Çeviri)
Ankara-İstanbul High-Speed Train Project passes through a rough topography. For high-speed railroad projects, because of the limited slope and curve tolerances the tunnels are prefered in the route studies. The excavation of Tunnel 26 located in graphitic schists between Bilecik and Bozüyük stations was started from entrance portal with NATM (New Austrian Tunnelling Method) in September- October 2009. The total progress is 298 meters in this part and average tunnelling progress rate is 2,0 m/day. Depending on the same local rock conditions along the tunnel route, it is provided that this progress rate won?t be changed. The required time to complete the 6100 m-long Tunnel 26 was calculated as 1525 days. The manufacturing of the tunnel arch concrete wasn?t added to this time. It is determined that after adding this time will be increased 200 days. Since therefore it is understood that the project won?t be completed in the foreseen time and because of the geologic-geotechnic properties of the tunnel route in case of excavating with NATM the tunnel manufacturing cost will be more than foreseen. Hence it is decided to excavate tunnel excavation system with the tunnel boring machine (TBM).The aim of this study is to estimate the TBM excavation performance by utilizing the local rock conditions forming the tunnel profile 26 of TBM having product id S-627. For this purpose, QTBM method has been used. As a result of the calculation, the progress rate is 8,35 m/hour and instant progress rate is 0,75 m/hour. Thus in the optimum conditions it is predicted that the tunnel manufacturing will be completed in a year.
Benzer Tezler
- A comparative study on the relationships between design parameters of tbms with two current examples of large section TBMs
TBM tasarım parametreleri arasındaki ilişkilerin araştırılması ve buna bağlı olarak iki büyük çaplı TBM projesinin incelenmesi
UĞUR ATEŞ
Yüksek Lisans
İngilizce
2013
Maden Mühendisliği ve Madencilikİstanbul Teknik ÜniversitesiMaden Mühendisliği Ana Bilim Dalı
PROF. DR. NUH BİLGİN
- Ankara - İstanbul hızlı tren projesi 35 nolu tünelde karşılaşılan kaya kütlelerinin mühendislik özelliklerinin değerlendirilmesi
Evaluation of engineering properties of rock properties encountered in the tunnel of 35 in Ankara-İstanbul high speed railway project
RECEP BASAR
Yüksek Lisans
Türkçe
2014
Maden Mühendisliği ve MadencilikDumlupınar ÜniversitesiMaden Mühendisliği Ana Bilim Dalı
YRD. DOÇ. DR. SUNAY BEYHAN
- Two-dimensional numerical analysis of tunnel collapse driven in poor ground conditions
Olumsuz zemin koşullarında açılmış tünel göçüğünün iki boyutlu sayısal analizi
MELİH TÜRKOĞLU
Yüksek Lisans
İngilizce
2013
İnşaat MühendisliğiOrta Doğu Teknik Üniversitesiİnşaat Mühendisliği Bölümü
PROF. DR. BAHADIR SADIK BAKIR
- Yüksek hızlı demiryollarının dünya üzerindeki uygulamaları ve Türkiye'ye adaptasyonu
High speed railway applications around the world and adaptation to Turkey
CENK ARSLAN
Yüksek Lisans
Türkçe
2010
UlaşımGazi Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
YRD. DOÇ. DR. M. KÜRŞAT ÇUBUK
- Metaheuristic based backcalculation of rock mass parameters around tunnels
Tünel çevresindeki kaya parametrelerinin metasezgisel tabanlı geri hesaplanması
GÖRKEM GEDİK
Yüksek Lisans
İngilizce
2018
İnşaat MühendisliğiOrta Doğu Teknik Üniversitesiİnşaat Mühendisliği Ana Bilim Dalı
DR. ÖĞR. ÜYESİ ONUR PEKCAN