Geri Dön

Pressure leaching of Caldag lateritic nickel ore

Çaldağ lateritik nikel cevherinin basınç altında liç edilmesi

  1. Tez No: 338324
  2. Yazar: MEHMET ALİ RECAİ ÖNAL
  3. Danışmanlar: PROF. DR. YAVUZ ALİ TOPKAYA
  4. Tez Türü: Yüksek Lisans
  5. Konular: Metalurji Mühendisliği, Metallurgical Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2013
  8. Dil: İngilizce
  9. Üniversite: Orta Doğu Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Metalurji ve Malzeme Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 178

Özet

Bu tez çalışmasının amacı, Çaldağ lateritik nikel cevherinin nikel ve kobalt değerlerinin kazanılması için birleştirilmiş basınç altında asit liçi ve hidroksit karışımı çöktürme prosesinin optimizasyonunu araştırmaktır.Nikel ve kobalt değerleri metal yüklü çözeltiye kazanılırken, basınç altında asit liçi yönteminin çeşitli proses parametrelerinden asit miktarı, sıcaklık, liç süresi ve tane boyutu karşılaştırmalı olarak ve sabit tutulan katı oranı ve karıştırma hızıyla çalışılmıştır.Birçok test sonucunda, birden fazla parametre kombinasyonunun %90'nın üzerinde nikel ve kobalt kazanımı sağladığı görülmüştür. Bu kombinasyonlar arasından, %94,1 nikel ve %94,0 kobalt kazanımı sağlayan 0,325 kg/kg asit cevher oranı, 250°C ve 1 saat süre ile %100 -1 mm tane boyutu optimum şartlar olarak seçilmiştir. Gerçek bir metal yüklü solüsyon stoğu bahsi geçen şartlarda hazırlanarak MHP yöntemine tabi tutularak işlenmiştir.İlk olarak iki aşamalı demir çöktürme basamaklarından sonra, başlıca empüritelerden olan demir, krom ve aluminyum neredeyse tamamen çözeltiden ayrıştırılırken nikel ve kobalt kayıpları kabul edilebilir miktarda tutulmuştur. Sonrasında, nikel ve kobalt iki aşamalı nikel-kobalt hidroksit çöktürme basamaklarında çöktürülmüştür.Bu aşamaların ilkinde, optimum şartlar olarak pH=7,10'da 60°C ve 1 saat süre belirlenmiştir. Bu şartlar altında elde edilen ara ürün çökeltinin %44,3 Ni, %3,01 Co miktarıyla beraber %3,06 Mn kontaminasyonu içerdiği görülmüştür.Sonuç olarak, Çaldağ lateritik nikel cevherinin büyük ölçüde basınç altında liç edilebilir olduğunun yanısıra çıkan metal yüklü solüsyonun nikel-kobalt hidroksit çöktürme yöntemiyle kolaylıkla proses edilebilir olduğu ve bu iki işlemin ardından satılabilir kalitede ara ürün sağladığı görülmüştür.

Özet (Çeviri)

The purpose of this study was to investigate the process optimization of combined high pressure acid leaching (HPAL) and mixed hydroxide precipitation (MHP) route for the extraction of nickel and cobalt from Çaldağ lateritic nickel ore.In order to extract nickel and cobalt values into pregnant leach solution (PLS), several process parameters of HPAL including acid load, temperature, leaching duration and particle size were investigated in comparative manner at constant solid concentration and agitation speed.After HPAL trials, it has been found that more than one combination of parameters offered higher than 90% extraction efficiencies for both nickel and cobalt. Among them, 0.325 kg/kg acid load, 250°C, 1 hour duration and 100% -1 mm particle size was selected as the optimum conditions with 94.1% Ni and 94.0% Co extractions. A stock of PLS was prepared under the stated conditions that was treated by downstream operations in order to obtain MHP.Initially by two-stage iron removal of downstream operations major impurities iron, chromium and aluminum were nearly completely removed with acceptable nickel and cobalt losses from PLS. Then, the nickel and cobalt were precipitated by two-stage mixed hydroxide precipitation.In the first step of MHP, the optimum conditions were chosen as pH=7.10, 60°C and 1 hour duration. The intermediate product obtained at these conditions contained 44.3% Ni, 3.01% Co with 3.06% Mn contamination.In summary, it was found that Çaldağ nickel laterite ore was readily leachable under HPAL conditions and PLS obtained was easily treatable in order to produce saleable MHP.

Benzer Tezler

  1. Çaldağ lateritik nikel cevherlerinden hidrometalurjik yöntemlerle nikel ve kobalt eldesi

    Nickel and cobalt extraction from Caldag lateritic nickel ores by using hydrometalurgical processes

    OZAN ÇOBAN

    Yüksek Lisans

    Türkçe

    Türkçe

    2014

    Metalurji Mühendisliğiİstanbul Teknik Üniversitesi

    Metalurji ve Malzeme Mühendisliği Ana Bilim Dalı

    PROF. DR. MAHMUT ERCAN AÇMA

  2. Fiziksel ve kimyasal ön işlemlerin lateritik nikel cevherlerinin atmosferik liçine etkisi

    The effect of physical and chemical pre-treatments on atmospheric leaching of a lateritic ore

    HÜSEYİN BAŞTÜRKCÜ

    Doktora

    Türkçe

    Türkçe

    2016

    Maden Mühendisliği ve Madencilikİstanbul Teknik Üniversitesi

    Cevher Hazırlama Mühendisliği Ana Bilim Dalı

    PROF. DR. NESET ACARKAN

  3. Hydrometallurgical extraction of nickel and cobalt from Çaldağ lateritic ore

    Çaldağ lateritik cevherlerinden hidrometalurjik olarak nikel ve kobalt kazanımı

    VEYSEL ÖZDEMİR

    Yüksek Lisans

    İngilizce

    İngilizce

    2006

    Maden Mühendisliği ve MadencilikOrta Doğu Teknik Üniversitesi

    Maden Mühendisliği Ana Bilim Dalı

    PROF.DR. ALİ İHSAN AROL

  4. Pressure leaching of Sivrihisar-Yunusemre nickel laterites

    Yunusemre-Sivrihisar lateritik nikel cevherinin basınç altında liçi

    BERK SEÇEN

    Yüksek Lisans

    İngilizce

    İngilizce

    2011

    Metalurji MühendisliğiOrta Doğu Teknik Üniversitesi

    Metalurji ve Malzeme Mühendisliği Bölümü

    PROF. DR. YAVUZ ALİ TOPKAYA

  5. Küre masif zengin bakır cevherinin basınç altında çözündürülmesi

    Pressure leaching of Küre massive rich copper ore

    KUDRET TAHSİN PEREK

    Doktora

    Türkçe

    Türkçe

    2003

    Maden Mühendisliği ve Madencilikİstanbul Teknik Üniversitesi

    Cevher-Kömür Hazırlama ve Değerlendirme Ana Bilim Dalı

    PROF. DR. FATMA ARSLAN