Proje yönetim bileşenleri ile belirsizlikten kaçınma eğilimi arasındaki ilişkiyi belirlemeye yönelik RTB1 bölgesinde bir araştırma

A research in TRB1 to determine the relationship between project management knowledge areas and tendency to uncertainty avoidance

  1. Tez No: 388072
  2. Yazar: SİNEM GÜRAVŞAR GÖKÇE
  3. Danışmanlar: PROF. DR. MEHMET TİKİCİ
  4. Tez Türü: Doktora
  5. Konular: İşletme, Business Administration
  6. Anahtar Kelimeler: Proje, proje yönetimi, belirsizlikten kaçınma, entegrasyonyönetimi, kapsam yönetimi, zaman yönetimi, maliyet yönetimi, kalite yönetimi, insan kaynakları yönetimi, iletişim yönetimi, risk yönetimi, tedarik yönetimi, Project, project management, avoiding uncertainty, integration management, scope management, time management, cost management, quality management, human resources management, communication management, risk management, procurement management
  7. Yıl: 2014
  8. Dil: Türkçe
  9. Üniversite: İnönü Üniversitesi
  10. Enstitü: Sosyal Bilimler Enstitüsü
  11. Ana Bilim Dalı: İşletme Ana Bilim Dalı
  12. Bilim Dalı: Yönetim ve Organizasyon Bilim Dalı
  13. Sayfa Sayısı: 199

Özet

Araştırma, proje yönetiminin belirsizlikten kaçınma toleransı ile ilişkisinin tespitine yönelik olarak tasarlanmıştır. Proje yürütmemiş işletmelerin proje bileşenlerine yönelik becerilerini ölçmek anlamlı olmayacağından araştırmanın anakütlesi istatistiki bölge sınıflandırmasına göre TRB1 Bölgesi olarak adlandırılan Malatya, Elazığ, Bingöl ve Tunceli illerinde faaliyet gösteren, Fırat Kalkınma Ajansı'ndan destek alan, proje uygulamasına geçen; dolayısıyla en az bir proje deneyimi olan firmaların proje koordinatörleri olarak seçilmiştir. Ekonomik Gelişme Mali Destek Programları kapsamında Ajanstan aldığı destekle proje uygulamaya başlayan özel sektör temsilcisi sayısı 74'tür. Bunlardan 31'i Malatya'da, 22'si Elazığ'da, 16'sı Bingöl'de ve 5'i Tunceli'de yerleşiktir. Özetle araştırmanın sonucunda proje yönetim bileşenlerine yönelik becerisi yüksek olan firmaların projenin doğasından gelen belirsizliklere tolerans düzeyinin de daha yüksek olduğu sonucuna varılmıştır. Bu durumu belirsizliğe toleransı yüksek olan firmaların proje yürütmeye daha istekli olduğu ve başarılı olmak için bu belirsizlikleri en iyi şekilde yönetmek üzere proje yönetimi anlayışını benimsediği şeklinde yorumlayabiliriz.

Özet (Çeviri)

The research is designed to define the relationship between the project management and the tolerance to avoiding uncertainty. Since it wouldn't be meaningful to measure the project management maturity of companies which did not manage any projects at all; the main population is selected as the companies in TRB1 Region (which is composed of Malatya, Elazığ, Bingöl and Tunceli) that had financial support from Fırat Development Agency and so has at least one project management experience. The number of companies that has financial support from Fırat Development Agency is 74. 31 of these are found in Malatya, 22 of them are in Elazığ, 16 are in Bingöl and 5 are in Tunceli. In summary, at the end of this research, it is defined that the companies who are successful at managing projects also have high tolerance to the uncertainty which comes from the nature of the project. This can be explained as the companies that have high tolerance to uncertainty are more desirous to manage projects and adopt to project management approach to manage this uncertainty in best way.

Benzer Tezler

  1. Risk management approach and risk analysis in solar thermal energy projects

    Termal güneş enerji projelerinde risk yönetimi yaklaşımı ve risk analizi

    YELİZ ŞİMŞEK

    Yüksek Lisans

    İngilizce

    İngilizce

    2014

    Enerjiİstanbul Teknik Üniversitesi

    Enerji Bilim ve Teknoloji Ana Bilim Dalı

    PROF. DR. ÜNER ÇOLAK

  2. Indicateurs de performance utilisés pour mesurer le succés des projets

    Proje başarısının ölçümünde kullanılan performans göstergeleri

    HANDE ÖZCAN

    Yüksek Lisans

    Fransızca

    Fransızca

    2004

    Endüstri ve Endüstri MühendisliğiGalatasaray Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    DOÇ.DR. ZİYA ULUKAN

  3. Simulation modeling and analysis of ship production: A case study

    Gemi üretiminin benzetim ile modellenmesi ve analizi: Vaka çalışması

    SELİM ALKANER

    Doktora

    İngilizce

    İngilizce

    1998

    Gemi Mühendisliğiİstanbul Teknik Üniversitesi

    Gemi İnşaatı ve Gemi Makineleri Mühendisliği Ana Bilim Dalı

    PROF. DR. REŞAT BAYKAL

  4. HITPMM-TR: En iyi uygulamalara dayanan bir hibrit bilişim proje yönetim metodu

    HITPMM-TR: A hybrid IT project management method based on best practices

    MURAT KURT

    Doktora

    Türkçe

    Türkçe

    2019

    Bilgisayar Mühendisliği Bilimleri-Bilgisayar ve KontrolAtatürk Üniversitesi

    Yönetim Bilişim Sistemleri Ana Bilim Dalı

    PROF. DR. ÜSTÜN ÖZEN

  5. Proje yönetimi sürecinde sürekli iyileştirmeye ilişkin anlayış

    An insight into the continuous improvement in project management

    EVLİYA DAĞGÖL

    Yüksek Lisans

    Türkçe

    Türkçe

    2023

    Mühendislik BilimleriAdana Alparslan Türkeş Bilim Ve Teknoloji Üniversitesi

    Ekonomik ve Sosyal Etki Değerlendirme Çalışmaları Ana Bilim Dalı

    DOÇ. DR. TUFAN ÖZSOY