Geri Dön

AHP ve Macar algoritması kullanılarak proje seçimi

Project selection with AHP and Hungarian algorithm

  1. Tez No: 672625
  2. Yazar: AHMET BURAK ATLI
  3. Danışmanlar: DOÇ. DR. FATMA SERAB ONURSAL
  4. Tez Türü: Yüksek Lisans
  5. Konular: İşletme, Business Administration
  6. Anahtar Kelimeler: Algoritmalar, Analitik hiyerarşi süreci, Macar algoritması, Proje seçimi, Proje yönetimi, Projeler, Algorithms, Analytical hierarchy process, Hungarian algorithm, Project selection, Project management, Projects
  7. Yıl: 2021
  8. Dil: Türkçe
  9. Üniversite: İstanbul Ticaret Üniversitesi
  10. Enstitü: Sosyal Bilimler Enstitüsü
  11. Ana Bilim Dalı: İşletme Ana Bilim Dalı
  12. Bilim Dalı: İşletme Bilim Dalı
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Proje seçimi günümüzde şirketlerin en sık karşılaştığı problemlerden biridir. Proje seçimi yaparken firmalar objektif bir perspektiften bakamamakta ve bu da hem şirket karlılığının düşmesine hem de büyük fırsatların kaçırılmasına sebep olmaktadır. Bu çalışmanın amacı şirketlerin daha objektif ve karlı projeleri seçmesine yardımcı olacak tekniklerden birkaçını sunmaktır. Şirketlerin bu hedeflerine ulaşabilmeleri için yöntemler belirli bir algoritma üzerinden uygulamaya konulmalıdır. Projeye başlamadan önce projeyi yapacak ekipler ve bu ekiplerin maliyetleri belirlenmeli, ardından şirkete uygun kriterler seçilmelidir. Bu kriterler proje yöneticileri, yönetici ve paydaşların ortak kararıyla oluşturularak kullanılması düşünülen teknikler aracılığı ile en uygun projeye karar verilmelidir. Bu çalışmada Macar algoritması ve Analitik Hiyerarşi Süreci(AHP) kullanılarak örnek bir yazılım firmasında proje seçimi yapılmış ve firmanın bu algoritmaya uyarak karar vermesi ile hem daha karlı hem de daha efektif proje seçimini gerçekleştirdiği gözlemlenmiştir. Analitik Hiyerarşi Süreci (AHP) yöntemi birden fazla proje bulunan ve aynı zamanda başlaması planlanan projelerin arasından seçim yapmakta kullanılmıştır. Ekipler, macar algoritması kullanılarak en uygun iş kalemlerine yerleştirilmiş, kriterler şirket ve proje yöneticileriyle belirlenmiş ve bu kriterler ışığı altında AHP uygulanmıştır. Uygulanan yöntemler ile uygun proje optimum maliyet ile seçilebildiği, başarı ile kapatılan projenin aynı zamanda hedeflenen optimum maliyet ile tamamlandığı gözlenmiştir. Sonuçlar incelendiği zaman belirli bir metodoloji ve teknik kullanılmadan sadece firmaların tahminlerinin objektif olamayacağı belirlenmiştir.

Özet (Çeviri)

Project selection is one of the problems faced today. The project selection firms cannot look from an objective perspective and this causes both the decrease in the profitability of the company and the missed great opportunities. This Intended Use Intended Use It is to present some of the techniques to help select profitable projects. In order for companies to achieve their goals, methods should be put on a specific algorithm, perhaps fraudulently. Before the project, the teams that will make the project and these teams should be researched, and then the criteria suitable for the company should be selected. These criteria should be established by the joint decision of the project managers, managers and stakeholders, and the most appropriate project should be decided through the techniques considered. In this study, Hungarian algorithm and Analytical Hierarchy Process (AHP) have been demonstrated, and a software software project application has been made, and it has been observed that the company has made a more profitable and more effective project selection with this algorithm. The Analytical Hierarchy Process (AHP) method is used to make a selection instead of projects that have more than one project and are planned to start at the same time. The teams were placed in the most appropriate work items adapted to the Hungarian algorithm, the criteria were published with the company and project managers and were applied in the light of these criteria. It has been observed that the appropriate project can be selected at optimum cost with the methods applied, and the successfully closed project is also completed with the targeted optimum cost. The results are stated that the estimates of the companies cannot be objective without using a certain methodology and technique at a certain time.

Benzer Tezler

  1. Ekimden 6 yıl sonra 19 farklı yonca çeşidinde verim ve dip kaplama özellikleri üzerinde bir araştırma

    Başlık çevirisi yok

    MEHMET ATA

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Ege Üniversitesi

    Tarla Bitkileri Ana Bilim Dalı

    Yükleniyor...

  2. Ankara koşullarında sulanabilir 10 hektarlık bir tarım işletmesi için en uygun mekanizasyon modelinin tespiti

    The Determining of optimum field machinery system for a farm which has 10 hectares irrigable area in Ankara conditions

    MUSTAFA VATANDAŞ

    Yüksek Lisans

    Türkçe

    Türkçe

    1987

    Ankara Üniversitesi

    Tarımsal Mekanizasyon Ana Bilim Dalı

    Yükleniyor...

  3. Dinamik absorberlerle titreşim kontrolu

    Başlık çevirisi yok

    M.ALAEDDİN ARPACI

    Doktora

    Türkçe

    Türkçe

    1984

    İstanbul Teknik Üniversitesi

    Yükleniyor...

  4. Yerli yapım bazı traktörlerin dişli kutuları üzerinde bir araştırma

    Başlık çevirisi yok

    TUNA DOĞAN

    Yüksek Lisans

    Türkçe

    Türkçe

    1988

    Ege Üniversitesi

    Tarımsal Mekanizasyon Ana Bilim Dalı

    Yükleniyor...