Geri Dön

Çok sayıda düz montaj hattının bütünleşik dengelenmesi: Otomatik kapı sistemleri üretiminde bir uygulama

Integrated balancing of multiple straight assembly lines: A case study in manufacturing of automatic door systems

  1. Tez No: 789309
  2. Yazar: AYŞEN AYKOL
  3. Danışmanlar: DR. ÖĞR. ÜYESİ YAKUP ATASAGUN
  4. Tez Türü: Yüksek Lisans
  5. Konular: Endüstri ve Endüstri Mühendisliği, Industrial and Industrial Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2023
  8. Dil: Türkçe
  9. Üniversite: Konya Teknik Üniversitesi
  10. Enstitü: Lisansüstü Eğitim Enstitüsü
  11. Ana Bilim Dalı: Endüstri Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Endüstri Mühendisliği Bilim Dalı
  13. Sayfa Sayısı: 51

Özet

Bu tez çalışmasında, Konya'da faaliyet gösteren ve otomatik kapı sistemleri üreten firmada bulunan çok sayıda düz montaj hattının bütünleşik olarak dengelenmesi uygulaması gerçekleştirilmiştir. Gökçen ve ark., (2010) tarafından geliştirilen matematiksel model kullanılarak dengeleme çalışması yapılmıştır. Öncelikle çalışma kapsamında ele alınan montaj hatları tanıtılmış olup montaj hatlarındaki görev ve öncelik ilişkileri belirlenmiştir. Daha sonra, geçmiş yıllardaki satış miktarları baz alınarak belirlenen çevrim zamanı ile bu hatların bütünleşik olarak dengelemesi gerçekleştirilmiştir. Montaj hatlarının, belirlenen çevrim zamanı değeri için bütünleşik olarak dengelenmesinde gerçekleşen optimum atama bilgileri aktarılmıştır. Dengeleme öncesi mevcut durumda 9 kişi ile gerçekleştirilen üretim için ihtiyaç duyulan işçi sayısı dengeleme sonucunda 3 kişiye düşürülerek %66 oranında iyileşme elde edilmiştir. Mevcutta 400 m2'lik alanda yapılan üretim uygulama sonucunda ortak istasyonlar elde ederek %80'lik kazançla 80 m2'lik alana düşürülmüştür. Sekiz farklı çevrim zamanı değeri için yapılan senaryo analizinde çözümlerin yedisinde bütünleşik dengeleme yaklaşımı ile elde edilen istasyon sayılarının hatların birbirinden bağısız dengelenmesi durumuna göre daha düşük olduğu görülmüştür. Bütünleşik dengeleme yaklaşımı sonucu açılacak ortak istasyonlar sayesinde toplam istasyon sayısının minimize edilmesi açısından önemli bir esneklik kazanılmıştır. Bu çalışma literatürde yer alan bir problemin gerçek hayat uygulamasının gerçekleştirilmesi açısından son derece önemlidir.

Özet (Çeviri)

In this thesis, the application of integrated balancing of multiple straight assembly lines in the company operating in Konya and producing automatic door systems has been carried out. The lines have been balanced using the mathematical model developed by Gökçen et al., (2010). First of all, the assembly lines, which was considered within the scope of the study, was introduced and the task and priority relations in the assembly lines were determined. Then, an integrated balancing was performed with the cycle time determined based on the sales of the previous years. Optimum assignment information is given in the integrated balancing of assembly lines for the determined cycle time. The number of workers needed for the production, which was carried out with 9 workers in the current situation before balancing, was reduced to 3 workers as a result of balancing, resulting in an improvement of 66%. As a result of the implementation, the production made on an area of 400 m2 at present was reduced to an area of 80 m2 with a gain of 80% by obtaining common stations. In the scenario analysis made for eight different cycle time values, it was seen that the number of stations obtained with the integrated balancing approach in seven of the solutions was lower than the case of independent balancing of the lines. Thus, thanks to the common stations to be opened as a result of the Integrated balancing approach, a significant flexibility has been gained in terms of minimizing the total number of stations. This study is extremely important in terms of real-life application of a problem in the literature.

Benzer Tezler

  1. Multimanned assembly line balancing problem: A case study in backhoe loader manufacturer

    Çok adamlı montaj hattı dengeleme problemi: Beko loder üretim fabrikasında bir vaka çalışması

    HÜSEYİN KARATAŞ

    Yüksek Lisans

    İngilizce

    İngilizce

    2019

    Endüstri ve Endüstri MühendisliğiGaziantep Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    DOÇ. DR. EREN ÖZCEYLAN

    DR. ÖĞR. ÜYESİ ZEYNEL ABİDİN ÇİL

  2. Bakteriyel besin arama optimizasyonu algoritması ile montaj hattı dengeleme

    Assembly line balancing by bacterial foraging optimization algorithm

    YAKUP ATASAGUN

    Yüksek Lisans

    Türkçe

    Türkçe

    2010

    Endüstri ve Endüstri MühendisliğiSelçuk Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    DOÇ. DR. YAKUP KARA

  3. Finite element modeling of an origami inspired delta mechanism

    Origamiden esinlenilmiş delta mekanizmasının sonlu eleman modellemesi

    ATA ARJOMANDI FARD

    Yüksek Lisans

    İngilizce

    İngilizce

    2023

    Makine Mühendisliğiİstanbul Teknik Üniversitesi

    Makine Mühendisliği Ana Bilim Dalı

    DOÇ. DR. ATAKAN ALTINKAYNAK

    DR. MERVE ACER KALAFAT

  4. Basit U-tipi montaj hattı dengelemede analitik yöntemlerin karşılaştırılması

    Comparing analytical methods for simple U-line line balancing problem

    AYŞE ELVAN BAYRAKTAROĞLU

    Yüksek Lisans

    Türkçe

    Türkçe

    2007

    Endüstri ve Endüstri Mühendisliğiİstanbul Teknik Üniversitesi

    Endüstri Mühendisliği Ana Bilim Dalı

    Y.DOÇ.DR. MURAT BASKAK

  5. Ev tipi buzdolabı soğutucu bölmesinde sıcaklık dağılımının deneysel ve sayısal incelenmesi

    Experimental and numerical investigation of temperature distribution in the fridge compartment of domestic static refrigerator

    SALİH AVCIOĞLU

    Yüksek Lisans

    Türkçe

    Türkçe

    2012

    Makine Mühendisliğiİstanbul Teknik Üniversitesi

    Makine Mühendisliği Ana Bilim Dalı

    PROF. DR. KADİR KIRKKÖPRÜ