Geri Dön

Nehir tipi hidroelektrik santrallerin yapım aşamasında farklı senaryolar için çevresel fayda maliyet analizlerinin karşılaştırılması

Comparison of environmental benefit-cost analysis for different scenarios for the construction of run-of-river type hydroelectric power plants

  1. Tez No: 891485
  2. Yazar: METİN YILMAZ
  3. Danışmanlar: PROF. DR. AYSEL GAMZE YÜCEL IŞILDAR
  4. Tez Türü: Doktora
  5. Konular: Çevre Mühendisliği, Environmental Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2024
  8. Dil: Türkçe
  9. Üniversite: Gazi Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Çevre Bilimleri Ana Bilim Dalı
  12. Bilim Dalı: Çevre Bilimleri ve Mühendisliği Bilim Dalı
  13. Sayfa Sayısı: 175

Özet

Hidroelektrik santraller, Türkiye'de hızla büyüyen önemli bir elektrik üretim kaynağı haline gelmiştir. Küresel çapta daha yeşil enerji kaynaklarına geçiş ve sera gazı emisyonlarını azaltma çabaları bağlamında, bu santrallerin çevresel etkilerinin değerlendirilmesi ve azaltılması zorunlu hale gelmiştir. Bu geçişin sürdürülebilir olması, hidroelektrik santral yatırımlarının çevre etkilerinin ve getireceği faydaların ayrıntılı bir şekilde değerlendirilmesiyle mümkündür. Sürdürülebilirliği değerlendirmek için en güçlü araçlardan biri Yaşam Döngüsü Analizi (YDA) yöntemidir. Bu çalışmada, 3 HES için geliştirilen 5 farklı senaryo çerçevesinde hidroelektrik santrallerin inşaat aşamasındaki çevresel etkileri YDA yöntemi ile incelenmiştir. Örenaltı HES, Çağlar HES ve Çamlık HES projeleri örneklerinde çevresel etkilerin ekonomik maliyet analizi yapılmış ve bu maliyetlerin yatırımın ekonomik değerine etkisi değerlendirilmiştir. Simapro programı kullanılarak 10 etki kategorisinde kapsamlı bir YDA gerçekleştirilmiş ve CML 2 (Leiden Üniversitesi Çevre Bilimleri Enstitüsü tarafından geliştirilen) metodolojisi ile çevresel etkiler ekonomik değere dönüştürülmüştür. Bu değerler inşaat maliyetlerine eklenerek, elde edilen elektrik enerjisi faydasıyla karşılaştırılmıştır. 49 yıllık yatırımların iç verim oranı (IRR) hesaplamaları çevresel etkiler dikkate alınarak yapılmıştır. Bu çalışma, hidroelektrik santrali yatırımlarının çevresel maliyetlerinin de dikkate alınarak planlanması gerektiğini vurgulamaktadır. Sonuçta, farklı HES senaryoları için, inşaat aşamasında 350,01 ton CO₂-eşd./MW (1,73 gr CO₂-eşd./Kwh) ile 7094,52 ton CO₂-eşd./MW (35,17 gr CO₂-eşd./kWh) arasında karbon salım değerlerine ulaşılmıştır. Bu değerlerin karşılığında incelenen projelerin iç verim oranları (IRR) çevresel maliyete bağlı olarak düşüş göstermiştir.

Özet (Çeviri)

Hydroelectric power plants have become a rapidly growing important source of electricity generation in Turkey. In the context of global efforts for transition to greener energy sources and reduce greenhouse gas emissions, it has become necessary to evaluate and reduce the environmental impacts of these power plants. Making this transition sustainable is possible by evaluating in detail the environmental impacts and benefits of hydroelectric power plant investments. One of the most powerful tools for assessing sustainability is the Life Cycle Analysis (LCA) method. In this study, the environmental impacts of hydroelectric power plants during the construction phase were examined with the LCA method within the framework of 5 different scenarios developed for 3 HEPPs. Economic cost analysis of environmental impacts was made in the examples of Örenaltı HEPP, Çağlar HEPP and Çamlık HEPP projects and the impact of these costs on the economic value of the investment was evaluated. A comprehensive LCA was carried out in 10 impact categories using the Simapro program, and environmental impacts were converted into economic value with the CML 2 (developed by the Institute of Environmental Sciences of Leiden University) methodology. These values were added to the construction costs and compared with the electrical energy benefit obtained. Internal rate of return (IRR) calculations for 49 years of investments were made taking into account environmental impacts. This study emphasizes that hydroelectric power plant investments should be planned by taking into account their environmental costs. As a result, for different HEPP scenarios, between 350.01 tons CO₂-eq./MW (1.73 g CO₂-eq./Kwh) and 7094.52 tons CO₂-eq./MW (35.17 g CO₂-eq.) during the construction phase. Carbon emission values between ./kWh) have been reached. In return for these values, the internal rate of return (IRR) of the projects examined decreased depending on the environmental cost.

Benzer Tezler

  1. Nehir tipi hidroelektrik santrallerinin Artvin'deki orman ekosistemlerinde neden olduğu arazi kullanım değişiminin ve arazi tahribatının belirlenmesi

    Determining land use change and land degradation on Artvin?s forest ecosystems caused by run-of-river type hydroelectric power plants

    HAKAN COŞKUN

    Yüksek Lisans

    Türkçe

    Türkçe

    2010

    Ormancılık ve Orman MühendisliğiArtvin Çoruh Üniversitesi

    Orman Mühendisliği Ana Bilim Dalı

    YRD. DOÇ. DR. MEHMET ÖZALP

  2. Nehir tipi hidrolektrik santrallerinin ekohidrolojik etkileri

    Ecohydrologic effects of runoff river type hydroelectric power plants

    İBRAHİM YURTSEVEN

    Doktora

    Türkçe

    Türkçe

    2012

    Ormancılık ve Orman Mühendisliğiİstanbul Üniversitesi

    Orman Mühendisliği Ana Bilim Dalı

    DOÇ. DR. YUSUF SERENGİL

  3. Nehir tipi hidroelektrik santral yatırımı inşaatlarında karşılaşılaşılan risklerin belirlenmesi

    Risk identification in the construction of river type hydroelectric power plants

    MEHMET ÇAYLIDEMİRCİ

    Yüksek Lisans

    Türkçe

    Türkçe

    2010

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    YRD. DOÇ. DR. ESİN ERGEN

  4. Sosyo-bilimsel bir konu olan Hidroelektrik Santraller konusunda değişik gruplardan insanların karar verme süreçlerinin incelenmesi

    Investigating decision making process of different groups of people about hydroelectric power plants which is a socio-scientific issue

    SALİHA ÖZTÜRK

    Yüksek Lisans

    Türkçe

    Türkçe

    2012

    Eğitim ve ÖğretimAbant İzzet Baysal Üniversitesi

    İlköğretim Ana Bilim Dalı

    DOÇ. DR. GÜLŞEN LEBLEBİCİOĞLU

  5. Edirne ili alçak düşülü akarsularında piko hidroelektrik enerjisi potansiyelinin değerlendirilmesi ve uygun bir türbin-generatör prototipinin geliştirilmesi

    Evaluation of pico hydroelectric energy potential in Edirne province low-head rivers and development of an appropriate turbine-generator prototype

    İSMAİL KIZILIRMAK

    Yüksek Lisans

    Türkçe

    Türkçe

    2023

    EnerjiTrakya Üniversitesi

    Uygulamalı Bilimler ve Teknoloji Ana Bilim Dalı

    DR. ÖĞR. ÜYESİ İSMAİL BECENEN