İzmit'te belirlenen noktada rüzgar ölçümü ve bu ölçümlere göre rüzgar çiftliğinin planlanması
Wind potential assesment and wind planning of a wind farm at a location in İzmit
- Tez No: 96838
- Danışmanlar: YRD. DOÇ. DR. TANAY SIDKI UYAR
- Tez Türü: Yüksek Lisans
- Konular: Elektrik ve Elektronik Mühendisliği, Eğitim ve Öğretim, Electrical and Electronics Engineering, Education and Training
- Anahtar Kelimeler: İzmit'te Rüzgar Potansiyeli, Rüzgar Hızı ve Rüzgar Yönü Ölçümü, İzmit'te Rüzgar Çiftliği Dizaynı
- Yıl: 2000
- Dil: Türkçe
- Üniversite: Kocaeli Üniversitesi
- Enstitü: Fen Bilimleri Enstitüsü
- Ana Bilim Dalı: Elektrik Eğitimi Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: 118
Özet
İZMİT'TE BELİRLENEN NOKTADA RÜZGAR ÖLÇÜMÜ VE BU ÖLÇÜMLERE GÖRE RÜZGAR ÇİFTLİĞİNİN PLANLANMASI Recai ÇAKAN
Özet (Çeviri)
WIND POTENTIAL ASSESMSNT AND WIND PLANNING OF A WIND FARM AT A LOCATION IN İZMÎT Recai ÇAKAN Keywords :Wind potential in İzmit, Measurement of Wind Speed and wind direction, Wind farm design Abstract: New and renewable energy sources are being utilized more and more all over the world. Renewable energy utilization for electrical energy supply is in its inital phase of development in Turkey. Wind measurements in Turkey have been carried out by State Meteorological Directarate at meteorological stations which are located in city center, with many obtacles around them. Recorded wind speed and direction values of The State Meteorological Directorate stations do not represent the real values of the locations. The data collected by the Meteorological Station in iznrit has been examined. It is if tbid data is taken into accounty if is not feasible to produce electricity from wind energy in Kocaeli. A project has been started by New andRenwable Energy Resources and Tecnologics Research Unit to investigate the wind energy utilization posibilite in Kocaeli. Wind speed and direction measurement have been started at a location near the new campus site with the project grant provided by Kocaeli Universty Research Fund.For the measurements two anenometer, one wind direction measurement equipment and one data logger have been purchased. 30 meter measurement mast provided by İzmit Greater City Municipality has been set up on the measurement location. The first anenometer has been assembled at a height of 10 meter and second anenometer and wind direction measurement equipments have been assembled at a height of 30 meter of the mast. Comparative assesment of the measurements results and the State Meteorological, station have been realized and the wind power potential of the site has been determined. The annual electric energy production capacity has been calculated by using the power curve of selcted wind turbines. The wind farm designed for the site has 14 wind turbines with a minumum shading effects on each other. Total annual IVelectricity which could be produced is calculated and prelininary work required for the design of a mind farm is completed.
Benzer Tezler
- Kuru incirlerde küf florası ve aflatoksigenik küflerin saptanması
Başlık çevirisi yok
SİBEL BÜYÜKŞİRİN
- Avmlerin fijital deneyim merkezlerine dönüşümü ve artırılmış gerçeklik tabanlı bir oyunlaştırılmış ortam önerisi: 'Forus'
The transformation of the malls to the phygital experience centers and as a gamification framework for ar based phygital retail: 'Forus'
ÇAĞIL ÖZALP
Yüksek Lisans
Türkçe
2019
Mimarlıkİstanbul Teknik ÜniversitesiBilişim Ana Bilim Dalı
DOÇ. DR. SEMA ALAÇAM
- Kırsal kesimdeki ailelerin mobilya satın alma karar süreçleri kentlerdekilerden farklı mıdır?
Is furniture buying decision process of rural families different from urban families?
FATİH KOÇ
Yüksek Lisans
Türkçe
2005
İşletmeKocaeli Üniversitesiİşletme Ana Bilim Dalı
PROF. DR. AHMET HAMDİ İSLAMOĞLU
- Liberal düşüncenin gelişiminde iktisat politikasının evrimi ve Türk örneği
The Evolution of economic policy in the development of liberal thought and the Turkish case
KIVANÇ ACAR