Geri Dön

Resource assessment in Aydin-Pamukören geothermal field

Aydın Pamukören jeotermal sahası kaynağının değerlendirilmesi

  1. Tez No: 268477
  2. Yazar: İLKER ATMACA
  3. Danışmanlar: DOÇ. DR. HASAN AYDIN BİLGİN, PROF. DR. MAHMUT PARLAKTUNA
  4. Tez Türü: Yüksek Lisans
  5. Konular: Maden Mühendisliği ve Madencilik, Mining Engineering and Mining
  6. Anahtar Kelimeler: Hacim analizi, Jeotermal, Jeotermal alanlar, Monte Carlo Yöntemi, Volumetric analysis, Geothermal, Geothermal fields, Monte Carlo Method
  7. Yıl: 2010
  8. Dil: İngilizce
  9. Üniversite: Orta Doğu Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Maden Mühendisliği Bölümü
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Son yıllarda enerji fiyatlarında ve talebindeki artış, yenilenebilir enerji kaynaklarına olan ilginin artması ve özendirilmesi, toplumsal çevre bilincinin gelişmesi, yerli kaynak kullanımına olan ilginin artması, yasal düzenlemelerin yapılması gibi nedenler jeotermal enerjiden elektrik üretmeye olan ilgiyi artırmıştır.Mevcut kaynakların etkin ve verimli kullanılabilmesi için jeotermal sahalara ait önemli bilgiler kuyu testleri ile elde edilebilmektedir. Kuyu testleri kuyular delinirken başlayan, kuyu bitiminden sonra jeotermal kaynağa uygun optimum performanslı işletme planlaması sürecinde devam eden ve jeotermal sistemlerin dinamik yapısı gereği işletme aşamasında da süreklik arz eden çalışmalardır.Aydın Kuyucak Pamukören sahasında üç kuyu açılmış olup, elde edilen sonuçlar olumludur. AP1 kuyusunda sadece CO2 gaz gelişi olduğundan, bu kuyu için test yapılmamıştır. AP2 ve AP3 kuyuları için yapılan testler ile sıcaklık, basınç ve üretim değerleri belirlenmiştir. Bu testler sonucunda, bu sahanın mevcut sıcaklık ve üretim miktarı ile Batı Anadolu Bölgesinde yer alan önemli sahalardan biri olacağı belirlenmiştir.Bu çalışmada, bu bölgeden elde edilebilir jeotermal enerji, jeotermal kaynak değerlendirmenin hacimsel metodu ile hesaplanmıştır. Monte Carlo simülasyon tekniği, Microsoft EXCEL'e ek bir yazılım programı olan @RISK ile birlikte kullanılmıştır.Aydın-Pamukören jeotermal sahasının elektrik üretim kapasitesi % 90 olasılıkla 45,2 MW olarak saptanmıştır. En olası elektriksel güç kapasitesi ise % 69 olasılıkla 78,75 MW olarak tayin edilmiştir. Sahanın tam kapasite ile kullanımı için gerekli olan kuyu sayıları; her kuyu başında 200 ton/saat üretim için 10 adet, 300 ton/saat üretim için 7 adet olarak hesaplanmıştır.

Özet (Çeviri)

Reasons like increases in the price and demand of energy in the last years, growing interest and support in the renewable energy resources, development of social environmental consciousness, interest in using domestic resources, having legal regulations has promoted the interest in the electricity production from geothermal energy.For the effective and productive use of existing resources, important data of geothermal regions are obtained with well tests. Well tests are the studies which starts while the well is drilling, continues after the well completion during the process of operation planning with optimum performance suitable to geothermal source and presents continuation also in the operation stage as required for the dynamic structure of geothermal systems.In Aydın Kuyucak Pamukören region three wells are drilled, achieved results are positive. At AP1 well only CO2 emission is present, no test is done for this well. With the tests for AP2 and AP3 wells temperature, pressure and production values are determined. By the results of these tests, it is determined that this region will be one of the important fields in the West Anatolian Region with current temperature and production rate.In this study, the geothermal energy recoverable from this region is calculated with volume method of geothermal resource assessment. Monte Carlo simulation technique is used with an add-in software program @RISK to Microsoft EXCEL.Electrical power capacity of Aydın-Pamukören geothermal field is determined as 45.2 MW with 90 % probability. The most likely electrical power value was found to be 78.75 MW with a probability of 69 %. The number of wells required are 10 for a production capacity of 200 t/hr and 7 for a production capacity of 300 t/hr at each well head.

Benzer Tezler

  1. Input-output modeling for Ankara water supply system

    Ankara su temini sistemi için girdi-çıktı modellemesi

    MEHMET GÜRSOY

    Yüksek Lisans

    İngilizce

    İngilizce

    1987

    İnşaat MühendisliğiOrta Doğu Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    PROF. DR. DOĞAN ALTINBİLEK

  2. Çekirdeksiz kuru üzümde uygulanan politikanın Ege Bölgesinde üretim ve üretici açısından sonuçlarının değerlendirilmesi

    Başlık çevirisi yok

    GÜVEN ÖZERİN

    Doktora

    Türkçe

    Türkçe

    1986

    ZiraatEge Üniversitesi

    Tarım Ekonomisi Ana Bilim Dalı

    PROF. DR. METİN TALİM

  3. Tabii ve yapay ahşabın optimizasyonu

    Başlık çevirisi yok

    OĞUZ AKSOY

    Yüksek Lisans

    Türkçe

    Türkçe

    1987

    MimarlıkGazi Üniversitesi

    Mimarlık Ana Bilim Dalı

    DOÇ. DR. REŞAT ÖNGEN

  4. Buca yerleşme merkezinde ekoloji yönünden önemli biyotoplar üzerinde araştırmalar

    Başlık çevirisi yok

    KEMAL TULUHAN YILMAZ

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Peyzaj MimarlığıEge Üniversitesi

    Peyzaj Mimarlığı Ana Bilim Dalı

  5. Böcek patojeni entomophthora virulenta üzerinde kültürel bir çalışma

    Başlık çevirisi yok

    ÖZNUR ÖZKÜTÜK

    Yüksek Lisans

    Türkçe

    Türkçe

    1984

    ZoolojiEge Üniversitesi

    Temel ve Endüstriyel Mikrobiyoloji Ana Bilim Dalı

    PROF. DR. MEHMET ÖNER