Geri Dön

İnşaat ihalelerinde keşfin veya teklif bedelin proje teslim süresi ve fiyat değişim tahminlerine dayalı olarak bulunması

Başlık çevirisi mevcut değil.

  1. Tez No: 33659
  2. Yazar: KENAN KAYACI
  3. Danışmanlar: YRD. DOÇ. DR. İLKER ÖZDEMİR
  4. Tez Türü: Yüksek Lisans
  5. Konular: Ekonomi, İnşaat Mühendisliği, Economics, Civil Engineering
  6. Anahtar Kelimeler: İnşaat Birim Fiyat Değişimi, İnşaat Gider Kontrolü, Proje Giderlerinin Tahmini, Fonksiyona Eğri Uydurma, İnşaat İhale Keşfi Ve Teklif Mektubu Hazırlanması, Keşif bedeli, Maliyet modeli, Teklif bedeli, İnşaat maliyetleri, The Change of Construction Unit Costs, Construction Overall Cost Controls, Estimating Project Costs, Curvef ittings to Functions, Preparation of Construction Bidding And Awards, Estimated cost, Cost model, Bid price, Construction costs
  7. Yıl: 1993
  8. Dil: Türkçe
  9. Üniversite: Anadolu Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: İnşaat Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

IV ÖZET Devlet İhale Yasasına göre yapı sektöründe imalatların metrajlarına bağlı keşif bedelleri, tasarım ya da avan proje aşamasında hesaplanmaktadır. Bu da keşfin ilgili yılın birim fiyatlarıyla belirlenmesine ve dolayısıyla işin gerçek üretim toplam maliyetlerinin bilinememesine sebep olmaktadır. Çalışmada, bu eksikliği giderme yönünde alınabilecek önlemler üze rinde durulmuş ve yatırımın tipine göre seçilecek bir iş programıyla belirlenecek inşaat süresine göre daha gerçeğe yakın tahmini bir maliyet modeli geliştirilmeye çalışılmıştır. Geliştirilen algoritma ve maliyet modeli, daha sonra BASIC dilinde programlanmış, biri küçük diğeri büyük iki toplu konut projesine uygulanmış ve gerçeğe oldukça yakın değerler elde edilmiştir. Sonuçta, algoritma ve yazılan bilgisayar programı daha basite indirgenerek, şantiyelerde kullanılabilecek hale getirilmiştir.

Özet (Çeviri)

ABSTRACT According to The State Bidding Law which has the number of 2886, estimated costs are accounted at the stage of project design or project preliminaries that are dependent upon product measurements in the construction industry. These causes the estimated costs to be accounted from the prices of the interested year and the real total product cost of construction to be unkown. In this study, some precautions will be discussed for dissappearing these deficiencies and a more real estimated cost model for defining with a planning tecnique that has been choosen according to the investment type and contruction due date will be presented. Presented algorithm and cost model, has been programmed later in BASIC, applied to two collected houses projects and obtained results which are close to facts. As conclusion, algorithm and computer programme has been simplified for using in sites.

Benzer Tezler

  1. Barajların hacim-verim ilişkisi üzerine bir araştırma

    Başlık çevirisi yok

    MEHMET KILIÇARSLAN

    Yüksek Lisans

    Türkçe

    Türkçe

    1987

    Çukurova Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  2. Çukurova bölgesinde biyoklimatik veriler kullanılarak açık ve yeşil alan sistemlerinin belirlenmesi ilkeleri üzerinde bir araştırma

    A research on the determination of the principles in open and green spaces systems by using the bioclimatic data in Çukurova region

    MEHMET FARUK ALTUNKASA

    Doktora

    Türkçe

    Türkçe

    1987

    Çukurova Üniversitesi

    Peyzaj Mimarlığı Ana Bilim Dalı

    Yükleniyor...

  3. Input-output modeling for Ankara water supply system

    Ankara su temini sistemi için girdi-çıktı modellemesi

    MEHMET GÜRSOY

    Yüksek Lisans

    İngilizce

    İngilizce

    1987

    Orta Doğu Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    Yükleniyor...