Geri Dön

Deri konfeksiyon üretim bölümü için iyileştirme önerisi: İşletme uygulaması

Proposal for improvement of a leather confectionery production department: Business application

  1. Tez No: 397474
  2. Yazar: HAMİDE TUBA KIZILKAYA
  3. Danışmanlar: PROF. FATMA ÖZTÜRK
  4. Tez Türü: Doktora
  5. Konular: Giyim Endüstrisi, İşletme, Clothing Industry, Business Administration
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2015
  8. Dil: Türkçe
  9. Üniversite: Gazi Üniversitesi
  10. Enstitü: Eğitim Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Giyim Endüstrisi ve Moda Tasarımı Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 186

Özet

Araştırma; deri konfeksiyon işletmesinde mevcut durumun analizi ile üretim sürecindeki farklılıkları ortaya çıkarmak, bu farklılıklar içerisinde belirlenen bantta iyileştirme için öneriler getirmek ve önerilen iyileştirme çalışmalarının uygulanması ile elde edilecek zamansal değişimleri ortaya koymayı amaçlamaktadır. Betimsel özelliğe sahip olan araştırmada örnek olay yöntemi kullanılmıştır. Araştırma İstanbul'da faaliyet gösteren bir deri konfeksiyon işletmesinde yapılmıştır. Veriler gözlem, görüşme ve zaman etüdü yöntemi ile elde edilmiştir. Çalışmada birinci aşamada iş akışındaki farklılıkların ortaya koyulması amacıyla mevcut durumun belirlenmesi ve işlem aşamalarının ortaya çıkarılması sürecinde zaman etüdü ile standart zamanlar üzerinden değerlendirilmesi çalışmaları yapılmıştır. İkinci aşamada elde edilen sonuçlar ile iyileştirme çalışmaları planlanan ön işlemler bandında üretim sürecini azaltacak işlem aşamaları için öneriler getirilmesi ve araçlar hazırlanması çalışmaları gerçekleştirilmiştir. Son aşamada ise geliştirilen araçların kullanılması öncesi ve sonrasında ön işlemler bandında bir model üzerinde zaman etüdü çalışması ile elde edilen standart zamanların karşılaştırılmasının sonuçları değerlendirilmiştir. Ön işlemler bandında yer alan yedi adet işlem için mevcut üretim sistemi ile toplam 16,03 dakika harcanırken önerilen iyileştirme çalışmaları ile bu süre 14,15 dakikaya inmiş ve toplamda %12'lik bir iyileştirme sağlanmıştır. Sürecin iyileştirilmesi ile ön işlemler bandında dört adet ürün artışı sağlanmaktadır. İşlemlerin kesintisiz ard arda devam ettiği göz önüne alındığında bu rakamsal artışın etkili bir değişikliğe neden olduğu ortaya çıkmaktadır.

Özet (Çeviri)

The purpose of the study is to present the differences in the production process by analyzing the current situation in a leather confection business enterprise; to conduct some studies regarding the applications suggested for improvement in a determined production line in these differences, thus to present the time changes that will be achieved by the application of suggested improvement works. The method of this study is a descriptive case study. The study was conducted in a leather confection business enterprise in Istanbul. The data was collected by observation, interviews and time study. First, to identify the production differences, the current situation was analyzed and by time study, standard time evaluation studies were done. Second, to lessen the production time on the production line of the pre-works, some suggestions were developed and equipment production studies were done. Lastly, by the application of developed equipment, standard times before and afterward were compared and the results were evaluated. With the current production system, seven processes at the pre-work band take total 16.03 minutes. With the suggested betterment studies, this time dropped to 14.15 min and it provides a betterment %12. This increases the production number by 4 pieces in pre-work band total production time. In a situation that continues ceaselessly, this numerical increase may cause an effective change in the total completed production number.

Benzer Tezler

  1. Yün endüstrisinde temiz üretim yönteminin uygulanması

    Implementation of cleaner production methodology in wool industry

    MELİHA EVŞEN ELMACI

    Yüksek Lisans

    Türkçe

    Türkçe

    2003

    Kimya Mühendisliğiİstanbul Teknik Üniversitesi

    Kimya Mühendisliği Ana Bilim Dalı

    PROF. DR. EKREM EKİNCİ

  2. Çok amaçlı karar verme metodları ve tekstil sanayiinde bir uygulama

    Multiple criteria decision making methods and an application to the textile industry

    H.EDA ÖZTÜRK

    Yüksek Lisans

    Türkçe

    Türkçe

    1992

    Endüstri ve Endüstri Mühendisliğiİstanbul Teknik Üniversitesi

    PROF. DR. RAMAZAN EVREN

  3. Çok katlı binalarda yeni deprem şartnamesine göre irdeleme ve uygulama

    Başlık çevirisi yok

    M.HAKAN ACUNSAL

    Yüksek Lisans

    Türkçe

    Türkçe

    1998

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    İnşaat Mühendisliği Ana Bilim Dalı

    PROF. DR. MELİKE ALTAN

  4. Deri konfeksiyon sanayiinde çalışma sistemlerinin incelenmesi ve rasyonalize edilmesi

    Başlık çevirisi yok

    NEVBAHAR GÖKSEL

    Doktora

    Türkçe

    Türkçe

    1997

    Tekstil ve Tekstil MühendisliğiEge Üniversitesi

    Tekstil Mühendisliği Ana Bilim Dalı

    PROF. DR. MUSTAFA NAZMİ ERCAN

  5. Tam zamanında üretim yönetimi ve Türk deri sanayinde uygulanabilirliği

    Just in time production system and its' applicability in Turkey leather industry

    ÇİĞDEM KANTARLI

    Yüksek Lisans

    Türkçe

    Türkçe

    1999

    İşletmeCelal Bayar Üniversitesi

    İşletme Ana Bilim Dalı

    PROF. DR. CENGİZ YILMAZ