Geri Dön

Döner kepçeli ekskavatör açık işletme yönteminde bilgisayar destekli üretim planlaması: Afşin-Elbistan linyit işletmesi çöllolar sahasına uygulanması

Computer aided open pit production planning of bucket wheel excavator: The Application on Afşin-elbistan lignite establishment, Çöllolar district

  1. Tez No: 65327
  2. Yazar: AHMET DAĞ
  3. Danışmanlar: PROF. DR. MESUT ANIL
  4. Tez Türü: Doktora
  5. Konular: Maden Mühendisliği ve Madencilik, Mining Engineering and Mining
  6. Anahtar Kelimeler: jeoistatiksel yatak modeilemesi, üretim planlaması, açık işletme sırtın, ilk kazı noktası, kazı sırası, Bilgisayar destekli planlama, Bilgisayar destekli üretim, Kazıcılar, geostatisticai modelling, production planning, open pit limit, location of opening-up, production scheduling, Computer aided planning, Computer aided manufacturing, Excavators
  7. Yıl: 1997
  8. Dil: Türkçe
  9. Üniversite: Çukurova Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Maden Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

VII öz Bu çalışmada, Döner Kepçeii Ekskavatör örtü kazı yöntemindeki, bütün kısıtlamaları ve parametreleri değerlendirerek, ilk kazı noktası, kazı makinesi gereksinimleri, basamak planlaması ve kazı sırası planiama aşamalarını belirleyen bir bilgisayar programı geliştirilmiştir. Bu bilgisayar programı, muhtemelen yakın gelecekte kurulacak 4x340 MW kapasiteli B-elektrik santralinin, kömür ihtiyacını karşılayacak olan Afşin-Elbistan Linyit (TEAŞ) Çölloîar açık işletmesine uygulanmıştır. İşletme ömrü boyunca kararların alınmasında, kısa ve orta vadeli üretim plardannın yapılmasında eide edilen sonuçlardan faydalanılacaktır. Bu program işletmenin diğer bir sahası olan Afşin bölgesinde planlanacak olan açık işletmeye de uygulanabilecektir. Üretim sırasının belirlenmesi aşamasından önce. açık işletme sınırı, ilk kazı noktası seçimi ve kazı yöntemi seçiminin yapılması gerekmektedir. Planlama parametrelerinin ve kısıtlamaların çokluğu ve bunların zamanla değişiklik arz etmesinden dolayı planlama aşamasındaki hesaplamaların bilgisayarla yapılması kaçınılmazdır.

Özet (Çeviri)

VIII ABSTRACT In this study, a computer program that determines the production planning, scheduling, the location of opening-up and equipment requirement has been developed on the bases of all constraints and parameters of Bucket Wheel Excavator stripping method. This computer program has been applied to Afşin-Elbistan Lignite Establishment (TEAS), Çöllolar district that is planned to provide lignite demand of Em power station in near future, having the capacity of 4x340 MW. During life of the lignite deposit, decisions on the short and medium term production planning are profited by results of the developed computer program. This computer program would be applied to Afşin district which is planned for the future use of lignite. Before determining the production scheduling, open pit 'limit, location of opening-up and mining method must be determined first. Due to number of planing parameter and varying constraints, it is inevitable to use computer on the planning stages.

Benzer Tezler

  1. İzmir'de bazı yolların kapatılarak yaya bölgeleri oluşturma da kent peyzajını geliştirme açısından yeniden planlanması üzerinde araştırmalar

    Başlık çevirisi yok

    BAHAR TÜRKYILMAZ

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Şehir ve Bölge Planlama Ana Bilim Dalı

    Yükleniyor...

  2. Testosteron dihidrotestosteron ve östrojenin benign prostat hiperplazisindeki etyolojik rolleri

    The roles of testosterone, dihydrotestosterone and estradiole on the etiology of benign prostatic hyperplasia

    HALUK TOKUÇOĞLU

    Tıpta Uzmanlık

    Türkçe

    Türkçe

    1986

    Gazi Üniversitesi

    Üroloji Ana Bilim Dalı

    Yükleniyor...

  3. Karıştırıcılar ve karıştırma kabındaki akım olaylarının incelenmesi

    Başlık çevirisi yok

    NADİR İLTEN

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Uludağ Üniversitesi

    Makine Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  4. Bir pamuk iplikhanesinde fiili çalışma metodlarının incelenmesi ve mevcut işlemlerin standart sürelerinin saptanması

    Başlık çevirisi yok

    MÜRŞİDE KESEROĞLU

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Tekstil Mühendisliği Ana Bilim Dalı

    Yükleniyor...