Geri Dön

Space specific fuse application and fuse blowing analysis on 100V fully regulated bus

Uzay uyumlu sigorta uygulamaları ve 100V regüleli bara geriliminde sigorta patlatma analizi

  1. Tez No: 669714
  2. Yazar: İBRAHİM GÜMÜŞ
  3. Danışmanlar: DOÇ. DR. SİNAN KIVRAK
  4. Tez Türü: Yüksek Lisans
  5. Konular: Savunma ve Savunma Teknolojileri, Defense and Defense Technologies
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2021
  8. Dil: İngilizce
  9. Üniversite: Ankara Yıldırım Beyazıt Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Savunma Teknolojileri Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Elektronik devre kartı barındıran sistemlerin en temel güvenlik önlemlerinin başında sigortalar bulunmaktadır. Devrede kullanıldığı yere göre farklı türleri bulunan sigortalar, kullanım alanlarına göre endüstriyel, askeri ve uzay tipi sigortalar olmak üzere üçe ayrılır. Ana güç barasından doğrudan beslenen, harici açma/kapama fonksiyonuna ihtiyaç duymayan veya sürekli iletimde kalacak kritik yüklerin güç dağıtımı için sigortalar kullanılmaktadır. Bu kullanılan sigortaların seçiminde bazı faktörler göze alınmaktadır. Bunlar bağlanan yükün in-rush akım karakteristiği, nominal akım ve gerilim değerleri, yaşam ömrü sonunda akım taşıma kapasitesinin azalması gibi faktörlerdir. Kullanılacak olan sigortaların katalog bilgisi yeterli kalmadığı veya bu bilgilerin doğrulanmasının istendiği durumlar olmuştur. Endüstriyel ve uzay tipi sigortaların kullanılacağı sisteme uygunluğunun analizini yapmak ve patlatma testlerini yaparak bir sistemin tasarımı bu tezin konusu olmuştur. Aynı zamanda farklı firmaların aynı katalog değerine sahip sigortaların karşılaştırılması için bu patlatma testi güvenilir bir yöntemdir. DC bara hattına iki adet seri röle ile sitemin kontrolü gerçekleştirilmiştir. Bu süre boyunca NTC üzerinden şarj edilen kapasitör bankası rölenin devreye alınmasıyla pasif edilerek kapasitör bankasının ototransformatör gerilimi ile tam şarj olması sağlanmıştır. Kapasitör bankası şarj edildikten sonra teste hazır hale gelen sistem ikinci rölenin tetiklenmesiyle sigorta testini gerçekleştirmektedir. Ayrıca kapasitör üzerindeki gerilim ölçülerek ana baranın sigorta patladıktan sonraki toparlanma süresi kaydedilmiştir. Tüm kontrol ve ölçüm işlemleri için mikro işlemcili bir kontrol devresi tasarlanmıştır.

Özet (Çeviri)

Fuses are among the most basic security measures of systems that house electronic circuit boards. There are three types of industrial, military and space type fuses according to the usage areas of the fuses with different types according to the place of use in the circuit. Fuse circuits are used for power distribution of critical loads that do not require an external ON/OFF function fed directly from the main power bus or remain in continuous transmission. Some factors are taken into consideration in the selection of fuses which used in these circuits. These factors are such as in-rush current characteristic of the load which is connected to circuit, nominal current and voltage values, reduction in current carrying capacity as a result of its life time. There have been cases where the catalog information of the fuses to be used is not sufficient or that this information is required to be verified. Verifying the compatibility of industrial and space type fuses with the system to be used by making detonation tests and comparing them with analysis. For this purpose, a test system has been designed and manufactured. At the same time, this explosion test is a reliable method for comparing the fuses of different companies with the same catalog value. The capacitor bank charge process is controlled by two serial relays on the DC line and discharge process is controlled by a thyristor. When the first relay (control to charge system) is switched on, the capacitor bank is fully charged with autotransformer voltage. After the capacitor bank is charged, the system performs a fuse test by activating thyristor. In addition, the voltage on the capacitor is measured and the recovery time of the main bus after the fuse blows is recorded. A microprocessor control circuit has been designed for all control and measurement processes.

Benzer Tezler

  1. İzmir'de bazı yolların kapatılarak yaya bölgeleri oluşturma da kent peyzajını geliştirme açısından yeniden planlanması üzerinde araştırmalar

    Başlık çevirisi yok

    BAHAR TÜRKYILMAZ

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Şehir ve Bölge Planlama Ana Bilim Dalı

    Yükleniyor...

  2. İzmir'de Mustafa Kemal Bulvarı'nın peyzaj mimarlığı açısından etüdü ve peyzaj projesi

    Başlık çevirisi yok

    ENGİN ALPARSLAN

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Peyzaj Mimarlığı Ana Bilim Dalı

    Yükleniyor...

  3. Hızlı katılaşma ile yüksek mukavemetli malzemelerin üretilmesi ve kurşun-asit akümalatörlerine uygulanması

    Başlık çevirisi yok

    ÜMİT AKÇAL

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    Uludağ Üniversitesi

    Makine Mühendisliği Ana Bilim Dalı

    Yükleniyor...

  4. Dual sayılar halkası ve şemsiye hareketleri üzerine

    Başlık çevirisi yok

    NURİYE KURUOĞLU

    Yüksek Lisans

    Türkçe

    Türkçe

    1986

    İnönü Üniversitesi

    Matematik Ana Bilim Dalı

    Yükleniyor...

  5. Küçük Yamanlar tepesi örneğinde kent yakın çevresinde rekreasyon alanı düzenleme projesi

    Başlık çevirisi yok

    NİHAN BULGUN

    Yüksek Lisans

    Türkçe

    Türkçe

    1985

    Ege Üniversitesi

    Peyzaj Mimarlığı Ana Bilim Dalı

    Yükleniyor...

  6. Çukurova bölgesinde biyoklimatik veriler kullanılarak açık ve yeşil alan sistemlerinin belirlenmesi ilkeleri üzerinde bir araştırma

    A research on the determination of the principles in open and green spaces systems by using the bioclimatic data in Çukurova region

    MEHMET FARUK ALTUNKASA

    Doktora

    Türkçe

    Türkçe

    1987

    Çukurova Üniversitesi

    Peyzaj Mimarlığı Ana Bilim Dalı

    Yükleniyor...