Geri Dön

Ofis binaları için enerji verimli ısıtma-soğutma-güç sistemleri

Energy efficient heating-cooling-power systems for office buildings

  1. Tez No: 675790
  2. Yazar: YUNUS EMRE ÖZPOLAT
  3. Danışmanlar: PROF. DR. YUSUFALİ KARA
  4. Tez Türü: Doktora
  5. Konular: Enerji, Makine Mühendisliği, Energy, Mechanical Engineering
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2021
  8. Dil: Türkçe
  9. Üniversite: Bursa Teknik Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Makine Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: 69

Özet

Ekonomik ve siyasi gereklilikler sonucu tüm dünyada yenilenebilir enerji yatırımları çeşitli teşvikler ile desteklenmekte, fosil yakıtlı sistemler ise regülasyonlar ile kısıtlanmaktadır. Bu tez; klasik ısıtma, soğutma, güç sistemlerini daha verimli hale getirmek veya alternatiflerini, yenilenebilir enerji kaynaklı sistemler ile üretmek ve bu alternatifi ofis binası kimliğine uygun yapılarda sayısal ortamda uygulamayı amaçlamaktadır. Bu nedenle ofis binası kimliğine uygun üç farklı sistem tasarımı sayısal ortamda farklı senaryolar olarak yürütülmüştür. Bu senaryolar klasik ısıtma-soğutma sistemi, birleşik soğutma-ısıtma-güç sistemi ve sıfır enerji binası olarak belirlenmiştir. Her bir senaryo için Bursa-Türkiye iklim şartlarında, kamu binası olarak hizmet vermekte olan, 1558 m2 taban alanı oturumlu, 6 katlı ve 9026 m2 kapalı alana sahip örnek binanın enerji ve yaşam döngüsü maliyet analizleri ayrı ayrı yapılmış olup, yenilenebilir enerji kaynaklı senaryo için 3 farklı alt senaryo üretilmiştir. Hourly Analysis Program (HAP) tarafından yürütülen analiz sonucu; bina soğutma dizayn yükü 742,7 kW, bina ısıtma dizayn yükü ise 439,8 kW olarak bulunmuştur. Toprak kaynaklı ısı pompası hesabı U tipi dikey kuyu tasarımı esas alınarak yapılmış olup, soğutma için gerekli kuyu boyu 20.371 m, ısıtma için gerekli kuyu boyu 9.137 m olarak hesaplanmıştır. Dikey kuyu boyu hesapları sonrası kuyuya deşarj edilen ortalama ısı miktarı -44,3 W/m, kuyudan çekilen ortalama ısı miktarı ise 34 W/m olarak belirlenmiştir. Fotovoltaik tesis yıllık enerji üretimi 607.639 kWh olarak belirlenmiş olup poly kristal silisyum hücreli paneller ile toplam yüzey alanı 2.787 m2 olan tesis kurulumu öngörülmüştür. Bu tesisin fotovoltaik panel kurulu gücü 463 kWp olarak hesaplanmıştır. Yaşam döngüsü maliyet analizleri P1-P2 metot kullanılarak yapılmış olup hesaplamalar sonucu birleşik soğutma-ısıtma-güç tesisi için fazladan yatırım bedeli geri ödeme süresi 37 ay iken iyileştirilmiş sıfır enerji binası dizaynı için 94 ay olarak bulunmuştur. Benzer olarak tesis yatırım bedelinin tamamını geri ödeme süresi ise birleşik soğutma-ısıtma-güç tesisi için 58 ay, iyileştirilmiş sıfır enerji binası için 127 ay olarak belirlenmiştir. Sonuç olarak ofis binası kimliğine uygun hibrit sıfır enerji binası (hava soğutmalı kondenser + toprak kaynaklı ısı pompası+ hava kaynaklı soğutucu+ fotovoltaik güç tesisi) tasarımı önerilmiştir.

Özet (Çeviri)

As a result of economic and political requirements, renewable energy investments are supported with various incentives all over the world, while fossil fuel systems are restricted by regulations. This article aims to make conventional heating, cooling and power systems more efficient or to develop an alternative system based on renewable energy by modelling an office building. For this reason, three different system designs compatible with office building identity are constructed as different scenarios on a computational setting. These scenarios are determined as classical heating-cooling system, combined cooling-heating-power system and zero energy building. Energy and life-cycle cost analyses of the test building, which serves as a public facility in the climate conditions of Bursa – Turkey, are conducted separately for each scenario, and 3 different sub-scenarios were generated under the renewable energy scenario. As a result of the analysis performed by using Hourly Analysis Program (HAP), the building's cooling design load was found to be 742.7 kW, and the heating design load was found to be 439.8 kW. The ground source heat pump calculation was performed by taking U-type vertical borehole as basis, which gave the resulting figures of necessary borehole length, 20,371 m for cooling and 9,137 m for heating. After vertical borehole calculations, the average amount of heat discharged into the borehole was determined as -44,3 W/m, and the average amount of heat drawn from the borehole was determined as 34 W/m. Annual energy generation of the photovoltaic plant was determined as 607.639 kWh, a value that was projected by a plant installation with polycrystalline silicon photovoltaic panel with a total surface area of 2.787 m2. The photovoltaic panel installed power of for this plant was calculated as 463 kWp. Lifecycle cost analyses were performed by using P1-P2 method and according to the calculations, the payback period for the extra investment cost is 37 months for the combined cooling-heating-power plant, whereas it is 94 months for the improved zero energy building design. Similarly, the payback period for the full investment cost is determined as 58 months for the combined cooling-heating-power plant, and 127 months for the improved zero energy building design. As a result, a hybrid zero energy building (air source condenser + ground source heat pump, hava kaynaklı soğutucu, photovoltaic power plant) is proposed as the best design option for the office building identity.

Benzer Tezler

  1. A methodology for energy optimization of buildings considering simultaneously building envelope HVAC and renewable system parameters

    Binalarda yapı kabuğu, mekanik sistemler ve yenilenebilir enerji sistemleri parametrelerinin eş zamanlı enerji optimizasyonu için bir yöntem

    MELTEM BAYRAKTAR

    Doktora

    İngilizce

    İngilizce

    2015

    Enerjiİstanbul Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    PROF. DR. AYŞE ZERRİN YILMAZ

    PROF. DR. MARCO PERINO

  2. Sirkülasyon pompaları için yüksek verimli senkron relüktans motor ve sürücü tasarımı

    Design of high-efficiency synchronous reluctance motor and drive for circulation pumps

    ARDA KILIÇ

    Doktora

    Türkçe

    Türkçe

    2023

    Elektrik ve Elektronik MühendisliğiPamukkale Üniversitesi

    Elektrik-Elektronik Mühendisliği Ana Bilim Dalı

    DOÇ. DR. SELAMİ KESLER

  3. Lighting energy management for office buildings and a case study

    Ofis binaları için aydınlatma enerjisi yönetimi ve bir örnek çalışma

    YEŞİM ÇELİKKOL

    Yüksek Lisans

    İngilizce

    İngilizce

    2012

    Mimarlıkİstanbul Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    PROF. DR. ALPİN KÖKNEL YENER

  4. Giydirme cephe kaplama sistemlerinin üretim ve kullanım süreci yaşam döngüsü değerlendirmesi

    The life cycle assessment of curtain wall cladding systems during the production and use processes

    ELHAM IGHANINEJAD MATNAGH

    Yüksek Lisans

    Türkçe

    Türkçe

    2019

    Mimarlıkİstanbul Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    DOÇ. DR. İKBAL ÇETİNER

  5. Investigating the energy efficiency of adaptive building skins and proposing a detailed folding adaptive skin system design for an office building in istanbul

    Uyarlanabilir bina kabuklarının enerji etkinliğinin istanbul'daki bir ofis binası için incelenmesi ve detaylı bir katlanan uyarlanabilir bina kabuğu sistemi önerilmesi

    CANAN BAŞ

    Yüksek Lisans

    İngilizce

    İngilizce

    2019

    Mimarlıkİstanbul Teknik Üniversitesi

    Mimarlık Ana Bilim Dalı

    DOÇ. DR. FATİH YAZICIOĞLU