4735 sayılı Kamu İhale Sözleşmeleri Kanunu'na tabi inşaat sözleşmelerinde işsahibi idarenin para borcunu ödemede temerrüdü
Default of the employer (public administration) in terms of payment of its monetary debt in construction contracts subject to Public Procurement Contracts Law (law number 4735)
- Tez No: 707497
- Danışmanlar: DR. ÖĞR. ÜYESİ VEHBİ UMUT ERKAN
- Tez Türü: Yüksek Lisans
- Konular: Hukuk, Law
- Anahtar Kelimeler: Borçlu temerrüdü, Hakediş ödemeleri, Kamu ihalesi, Kamu İhale Kanunu, Para borcu, Temerrüt, Temerrüt faizi, İhale, İnşaat sözleşmeleri, Default of debtor, Progress payments, Public bidding, Public Procurement Law, Money debts, Default, Default interest, Tender, Construction contracts
- Yıl: 2021
- Dil: Türkçe
- Üniversite: Ankara Üniversitesi
- Enstitü: Sosyal Bilimler Enstitüsü
- Ana Bilim Dalı: Özel Hukuk Ana Bilim Dalı
- Bilim Dalı: Belirtilmemiş.
- Sayfa Sayısı: Belirtilmemiş.
Özet
Kamu İhale Sözleşmeleri Kanunu'nda tarafların eşitliği temel ilke olarak kabul edilmekle birlikte, bu Kanun'da daha çok idareyi koruyan hükümlere yer verilmiş, yüklenicinin haklarına ilişkin hususlar düzenlenmeyerek genel hükümlere bırakılmıştır. Bu çalışmada, KİSK'e tabi inşaat sözleşmelerinin genel özellikleri incelendikten sonra, idarenin asli edim borcu olan para borcunun miktarı, ödeme şekli ile ne zaman muaccel olacağı ele alınmıştır. Çalışmada ayrıca idarenin para borcunu ifasında temerrüdü için gereken şartlar ile temerrüdün para borcuna özgü sonuçları incelenmiş, temerrüde bağlı olarak yüklenicinin süre uzatımı isteme hakkı ile işi durdurma hakkının bulunup bulunmadığı hususları üzerinde durulmuştur. Son olarak hakediş ödemeleri, temerrüt faizi ve aşkın zararın tabi olduğu zamanaşımı süreleri incelenmiştir.
Özet (Çeviri)
Although equality between parties is adopted as the main principle, the Public Procurement Contracts Law (PPCL) contains mostly provisions that safeguard the administration, and matters relating to the rights of the contractor are left to be dealt with under general provisions. This study first examines the general characteristics of construction contracts subject to PPCL, then moves on to discuss the amount of money owed by the administration as its main obligation under a contract, its method of payment, and when it falls due. The study also examines the conditions required for the default of the administration in performance of its monetary debt, as well as the consequences of the default specific to monetary debt; and explores the issue of whether the contractor has the right to request time extension or the right to suspend work in relation to the default. Lastly, the progress payments, the interest for default and the statute of limitations for the excess damage is discussed.
Benzer Tezler
- Kamu ihale sözleşmelerinde nefaset kesintisi
Excellence deduction in public procurement contracts
YUSUF USLU
Yüksek Lisans
Türkçe
2019
HukukAnkara Hacı Bayram Veli ÜniversitesiÖzel Hukuk Ana Bilim Dalı
PROF. DR. CEMAL OĞUZ
- Pastörizasyondan sonra kültür ilavesinin ekşi kremadan yapılan tereyağlarının özelliklerine etkisi üzerine bir araştırma
Başlık çevirisi yok
SERAP TAMER
Yüksek Lisans
Türkçe
1985
Gıda MühendisliğiEge ÜniversitesiSüt Teknolojisi Ana Bilim Dalı
YRD. DOÇ. DR. ERGİN OKTAR
- Bornova ekolojik koşullarında bazı haşhaş çeşitlerinin verim ve kaliteleri üzerinde araştırmalar
The Investigations on the yield and qualities of some popy vasied Bornova ecological conditions
HAMDİ AYGÜN
Yüksek Lisans
Türkçe
1985
ZiraatEge ÜniversitesiTarla Bitkileri Ana Bilim Dalı
PROF. DR. ŞÜKRÜ HAZIM EMİROĞLU
- Bornova (İzmir) koşullarında çeşitli kültür bitkilerinde zarar yapan Dolycoris baccarum (L.) (Heteroptera: Pentatomidae)'un biyolojisi ve ekolojisi üzerinde araştırmalar
Investigations on the biology and ecology of Dolycoris baccarum (L.) (Heteroptera: Pentatomidae) which attacks to various plants of economic importance at Bornova (İzmir)
YUSUF KARSAVURAN
- Kemalpaşa etlik piliç işletmelerinin teknik ve ekonomik yönden incelenmesi
Başlık çevirisi yok
HAYRİ TUNA YÜKSELEN