The identification of the causes that have contributed to the delay in construction projects in the Iraqi city of Mosul

Irak'ın Musul şehri inşaat projelerindeki gecikmeye katkı sağlayan nedenlerin belirlenmesi

  1. Tez No: 752680
  2. Yazar: AHMED HAITHAM GHAZI GHAZI
  3. Danışmanlar: DR. ÖĞR. ÜYESİ REDVAN GHASEMLOUNIA
  4. Tez Türü: Yüksek Lisans
  5. Konular: Mühendislik Bilimleri, Engineering Sciences
  6. Anahtar Kelimeler: Belirtilmemiş.
  7. Yıl: 2022
  8. Dil: İngilizce
  9. Üniversite: İstanbul Gedik Üniversitesi
  10. Enstitü: Lisansüstü Eğitim Enstitüsü
  11. Ana Bilim Dalı: Mühendislik Yönetimi Ana Bilim Dalı
  12. Bilim Dalı: Mühendislik Yönetimi Bilim Dalı
  13. Sayfa Sayısı: 99

Özet

Çalışmanın amacı, Irak'ın Musul kentindeki inşaat projelerinde uzun süre gecikmelere neden olan ana faktörleri belirlemektir. Çalışma aynı zamanda müteahhit, mal sahibi ve danışman da dahil olmak üzere projeye dahil olan tüm paydaşlar arasında proje gecikmelerine neden olan riskler konusunda farkındalık yaratmayı amaçlamaktadır. Bu çalışmanın temel motivasyonu, son birkaç yılda Musul'daki inşaat projelerinin tamamlanmasındaki artan gecikmedir özellikle birçok hükümet binasının yanı sıra köprülerin, yolların ve diğer altyapının yıkımına sahne olan IŞİD'e karşı savaştan sonra. Yeniden yapılanma başladığında, çoğu inşaat projesinin ertelendiği, bunun da zaman aşımları ve artan maliyet tahminleri gibi bu projelerin başarısını olumsuz etkilediği gözlendi. Saha araştırması, halen devam eden projeler ve daha önce tamamlanmış projeler için, saha anketine katılanların görüşlerinin elektronik bir anket aracılığıyla, gerçek yanıtlar ve nedenler hakkında farklı bakış açıları toplamak için kullanılır. Gecikmenin en önemli nedenlerinin analizi ve sınıflandırılması göreceli önem indeksi kullanılarak yapılır, ankete cevap verenlerin bakış açısından ortaya çıkma sıklığına dayalıdır. Bu çalışma, birleşik bir nicel ve nitel araştırma stratejisi kullanır, nitel veri elde etmek için bir vaka çalışması ve nicel veri elde etmek için elektronik bir anket kullanan bir saha araştırması ile. Ardından, saha araştırması veya ankete katılan kişiler hakkında genel bilgi vererek verileri analiz edilir ve sonuçları çıkartılır, aynı zamanda Musul'daki inşaat projelerinde gecikmelere neden olan faktörleri ortaya koyarak, bunların oluşma sıklığına ve meydana geldiği öneme göre sıralanmıştır. Son olarak, tamamlanan çalışmanın bir özetinin yanı sıra inşaat projelerinde gecikmelere neden olan nedenlerin önlenmesi veya azaltılmasına yönelik fikir ve öneriler sağlanmaktadır

Özet (Çeviri)

The purpose of the study is to identify the main factors that have contributed to the long delays in construction projects in Mosul, Iraq. The study also aims to raise awareness of the risks that cause project delays among all stakeholders involved in the project, including the contractor, owner, and consultant. The primary motivation for this study is the increased delay in the completion of construction projects in Mosul over the past few years, particularly after the war against ISIS, which saw the destruction of many government buildings as well as bridges, roads, and other infrastructure. When reconstruction began, it was observed that most construction projects were delayed, resulting in a negative impact on the success of these projects, such as time overruns and increased cost estimates. The field survey is used for projects that are still going on and for projects that have already been completed, with the assistance of the opinions of participants in the field survey via an electronic questionnaire, in order to gather genuine responses and diverse perspectives on the causes. The analysis and classification of the most significant causes of delay are carried out using the relative importance index (RII), which is based on the frequency with which they occur from the perspective of those who responded to the questionnaire. This study employs a combined quantitative and qualitative research strategy, with a case study being utilized to obtain qualitative data and a field survey using an electronic questionnaire to acquire quantitative data. And then analyze the data and extract the results by providing general information about the people who took part in the field survey or questionnaire, while also revealing the factors that cause delays in construction projects in Mosul, ranked by the frequency with which they occur and the importance with which they occur. Finally, a summary of the study completed is provided, as well as ideas and recommendations for preventing or reducing the reasons that cause delays in construction projects.

Benzer Tezler

  1. Köprü hasarlarının dinamik test verileri ile saptanması

    Identification of bridge damages by using vibration based test data

    B. ÖZDEN ÇAĞLAYAN

    Doktora

    Türkçe

    Türkçe

    2001

    İnşaat Mühendisliğiİstanbul Teknik Üniversitesi

    PROF. DR. ERDOĞAN UZGİDER

  2. Sağlıkta kalite ve mükemmellik arayışı: Altı Sigma

    The pursuit of quality and perfection in healthcare: Six Sigma

    MAHMUT PAŞA GÜLTAŞ

    Doktora

    Türkçe

    Türkçe

    2020

    Sağlık Kurumları Yönetimiİnönü Üniversitesi

    İşletme Ana Bilim Dalı

    DOÇ. DR. MUSTAFA YÜCEL

  3. Cyber tools as foreign policy instruments in trilateral relations: Analysing cyber-attacks targeting the United Kingdom

    Üçlü ilişkilerde dış politika aracı olarak siber araçlar: Birleşik Krallık'ı hedef alan siber saldırıların analizi

    ATAKAN YILMAZ

    Doktora

    İngilizce

    İngilizce

    2024

    Siyasal BilimlerGalatasaray Üniversitesi

    Uluslararası İlişkiler Ana Bilim Dalı

    DOÇ. DR. MENENT SAVAŞ CAZALA

  4. Кыргыз күрөшүнүн түрлөрү жана өнүгүү этаптары

    Kırgız güreşinin türleri ve gelişim aşamaları

    BAKTIBEK ASILTAŞOV

    Yüksek Lisans

    Kırgızca

    Kırgızca

    2024

    SporKırgızistan-Türkiye Manas Üniversitesi

    Beden Eğitimi ve Spor Ana Bilim Dalı

    PROF. DR. KANAT CANUZAKOV

  5. Gemi trafik hizmetleri deniz trafik operatörü seçim kriterlerinin değerlendirilmesi

    Evaluation of vessel traffic operator selection criteria for vessel traffic services

    DENİZ TOKDEMİR

    Yüksek Lisans

    Türkçe

    Türkçe

    2024

    Denizcilikİstanbul Teknik Üniversitesi

    Deniz Ulaştırma Mühendisliği Ana Bilim Dalı

    PROF. DR. YASİN ARSLANOĞLU