Geri Dön

Jeoistatistik ve bulanık yaklaşımlar ile adana çimento hammadde sahasının değerlendirilmesi

Evaluation of adana cement raw material field by geostatistics and fuzzy approaches

  1. Tez No: 178607
  2. Yazar: BETÜL ALKAN
  3. Danışmanlar: Y.DOÇ.DR. AHMET DAĞ
  4. Tez Türü: Yüksek Lisans
  5. Konular: Maden Mühendisliği ve Madencilik, Mining Engineering and Mining
  6. Anahtar Kelimeler: Adana Çimento, Bulanık Yaklaşım, Kriging, Kestirim, Rezerv Belirleme, Adana Cement, Fuzzy Approach, Kriging, Thickness Estimating, Rezerve Calculation
  7. Yıl: 2007
  8. Dil: Türkçe
  9. Üniversite: Çukurova Üniversitesi
  10. Enstitü: Fen Bilimleri Enstitüsü
  11. Ana Bilim Dalı: Maden Mühendisliği Ana Bilim Dalı
  12. Bilim Dalı: Belirtilmemiş.
  13. Sayfa Sayısı: Belirtilmemiş.

Özet

Çimento üretiminde hammadde homojenliğinin sağlanabilmesi ve üretim planlaması için hammadde sahalarının, sınır, rezerv ve kalite dağılımlarının belirlenmesi gerekir. Bu amaç doğrultusunda sahada genellikle karotlu sondaj çalışmaları yapılır. İstenilen her noktada sondaj yapmak ekonomik olmayacağından önce sahada yeterli sayıda sondaj yapılır. Sonra da bu veriler ve tahmin teknikleri kullanılarak istenilen noktaların bilgileri tahmin edilebilir. Yatağın özellikleri ve kullanılan modelleme tekniğine bağlı olarak kestirim tekniklerinin performansları değişir. Bu çalışmada, Adana Çimento hammadde sahasına ait 74 adet sondaj logları değerlendirilerek uygun veri dosyaları oluşturulmuştur. Bunlardan marn kalınlık bilgileri ile poligon, kriging ve Bulanık yaklaşımı ile kestirimlerin performansları belirlenmiştir. Bulanık yaklaşımı ile yapılan tahminin daha hassas olduğu görülmüştür. Saha ile ilgili bütün veriler kullanılarak modellemeler yapılmış ve istenilen bölgelerin rezervi için kalınlık kestirimleri gerçekleştirilmiştir.

Özet (Çeviri)

Limits, reserve and quality distribution of raw material field should be determined for production planning and providing of raw material homogeneity in cement production. For this aim, borehole studies are generally carried out in the field. Firstly, enough number of boreholes is done in the field in view of the fact that performing drill per desired location will not be economic. Afterwards, information of desired point is estimated using borehole data and estimating techniques. Prediction performances of estimating techniques change depend on field properties and used modeling technique. In this study, acceptable data files were obtained by evaluating of 74 boreholes belong to raw material field of Adana cement. Estimating performance of polygon, kriging and fuzzy approach were computed by only the marl thickness data file. Obtained results showed that fuzzy approach performance is the best one. Geostatistics and fuzzy modeling were done and thicknesses were estimated for reserve calculating of choosed field by using modeling parameters and entire data files.

Benzer Tezler

  1. Gümüşköy (Kütahya) gümüş maden yatağı rezervinin jeoistatistik teknikle hesaplanması

    Başlık çevirisi yok

    RAMAZAN BALTACI

    Yüksek Lisans

    Türkçe

    Türkçe

    1988

    Hacettepe Üniversitesi

    İstatistik Ana Bilim Dalı

    Yükleniyor...

  2. Geostatistical evaluation of the Gümüşköy silver deposit (Kütahya-Turkey)

    Başlık çevirisi yok

    AZİZ MUSA PARLAKYİĞİT

    Doktora

    İngilizce

    İngilizce

    1989

    Orta Doğu Teknik Üniversitesi

    Yükleniyor...

  3. Payas bölgesi (Hatay) demirli boksit oluşumlarının kökenine yönelik jeokimyasal ve maden mikroskopik incelemeler

    The Geochemical and ore microscopic investigations of payas region (Hatay) ferric bauxite occurrences and their genesis

    MEHMET ALİ DEĞER

    Yüksek Lisans

    Türkçe

    Türkçe

    1991

    Ankara Üniversitesi

    Yükleniyor...